The Bicutan AGT is an automated guideway transit (AGT) system under development as of 2024[update] within the City of Taguig in the Philippines. It will serve as test track for the second mass transit system to be built and developed in the country by local engineers.
| Bicutan Automated Guideway Transit System | |
|---|---|
Bicutan AGT System | |
| Overview | |
| Status | Discontinued |
| Locale | Taguig, Metro Manila, Philippines |
| Service | |
| Type | Automated Guideway Transit (AGT) |
| Services | Taguig C-6 (planned) |
| Technical | |
| Track length | 372 m (1,220 ft) (test track) 6.9 km (4.3 mi) (planned) |
| Number of tracks | 1 |
| Operating speed | 50–60 km/h (31–37 mph) (planned) |
| Highest elevation | 10 m (33 ft) |
Despite some media reports calling it a monorail, the system uses two parallel concrete beams to form a track.
See also
- Automated Guideway Transit System project (Philippines)
wikipedia, wiki, encyclopedia, book, library, article, read, free download, Information about Bicutan Automated Guideway Transit System, What is Bicutan Automated Guideway Transit System? What does Bicutan Automated Guideway Transit System mean?