List of Mumbai Metro stations

This is a list of all stations of the Mumbai Metro, a rapid transit system serving Mumbai in the Mumbai Metropolitan Region, India. The Mumbai Metro is the fifth transit system to be built in India. The first line of the Mumbai Metro was opened on 8 June 2014 with Blue Line 1, with the current total number of 68 stations operating as of October 2025.

Currently, the expansion of the Mumbai Metro network is going to be around 200 km (120 mi). This expansion will allow Mumbai to connect with its satellite cities that lay in the Mumbai Metropolitan Region.

Each line of the Mumbai Metro is identified by a specific color. The system uses rolling stocks of standard gauge trains and has a combination of elevated, underground and at-grade lines.

Metro stations

Terminal station
* Transfer station
†* Terminal and transfer station to other lines
†† Transfer station to Mumbai Suburban Railway and Mumbai Monorail
** Transfer station to other lines and Mumbai Suburban Railway and Mumbai Monorail
#* Terminal and transfer station to Mumbai Suburban Railway, Mumbai Monorail and Indian Railways
†¤ Terminal, transfer station to other lines, Mumbai Suburban Railway, Mumbai Monorail and Indian Railways

This list is sortable. Click on the icon in the column header to change sort key and sort order.

Operational

Station name Line Layout Platform layout Status Notes Ref.
English Marathi
Aarey आरे Line 7 Elevated Side Operational from
2 April 2022
Aarey JVLR†* आरे जे.व्ही.एल.आर. Aqua Line At-grade Side Operational from 5 October 2024 Interchange with Line 6 on SEEPZ Village
Acharya Atre Chowk आचार्य अत्रे चौक Aqua Line Underground Island Operational from 9 May 2025
Airport Road विमानतळ रस्ता Line 1 Elevated Side Operational from
8 June 2014
Akurli आकुर्ली Line 7 Elevated Side Operational from
2 April 2022
Anand Nagar आनंद नगर Line 2A Elevated Side Operational from
2 April 2022
Andheri (West)* अंधेरी (पश्चिम) Line 2A Elevated Side Operational from 19 January 2023 Interchange with Line 1 on D.N. Nagar
Andheri†† अंधेरी Line 1 Elevated Side Operational from
8 June 2014
Transfer station to Andheri railway station
Asalpha असल्फा Line 1 Elevated Side Operational from
8 June 2014
Azad Nagar आझाद नगर Line 1 Elevated Side Operational from
8 June 2014
Bandra Colony वांद्रे वसाहत Aqua Line Underground Island Operational from 5 October 2024
Bandra Kurla Complex* वांद्रे कुर्ला संकुल Aqua Line Underground Island Operational from 5 October 2024 Interchange with Line 2B on Income Tax Office
Bangur Nagar बांगूर नगर Line 2A Elevated Side Operational from 19 January 2023
Borivali (West) बोरीवली (पश्चिम) Line 2A Elevated Side Operational from
2 April 2022
Chakala (J B Nagar) चकाला (जे.बी. नगर) Line 1 Elevated Side Operational from
8 June 2014
Chhatrapati Shivaji Maharaj International Airport - T1 छत्रपती शिवाजी महाराज आंतरराष्ट्रीय विमानतळ - टी१ Aqua Line Underground Island Operational from 5 October 2024
Chhatrapati Shivaji Maharaj International Airport - T2†* छत्रपती शिवाजी महाराज आंतरराष्ट्रीय विमानतळ - टी२ Aqua Line
Line 7
Line 8
Underground Side and island Operational from 5 October 2024;
under construction
Chhatrapati Shivaji Maharaj Terminus†¤ छत्रपती शिवाजी महाराज टर्मिनस Aqua Line
Line 11
Underground Side and island Operational from 9 October 2025;
under construction
Transfer station to Chhatrapati Shivaji Maharaj Terminus
Churchgate†† चर्चगेट Aqua Line Underground Island Operational from 9 October 2025 Transfer station to Churchgate railway station
Cuffe Parade† कफ परेड Aqua Line Underground Island Operational from 9 October 2025
D N Nagar* डी.एन. नगर Line 1 Elevated Side Operational from
8 June 2014
Interchange with Line 2A on Andheri West
Dadar दादर Aqua Line Underground Island Operational from 9 May 2025
Dahanukarwadi डहाणूकरवाडी Line 2A Elevated Side Operational from
2 April 2022
Dahisar (East)†* दहिसर (पूर्व) Line 2A
Line 7
Elevated Side and island Operational from
2 April 2022
Devipada देवीपाडा Line 7 Elevated Side Operational from
2 April 2022
Dharavi धारावी Aqua Line Underground Island Operational from 9 May 2025
Dindoshi दिंडोशी Line 7 Elevated Side Operational from
2 April 2022
Eksar एकसर Line 2A Elevated Side Operational from
2 April 2022
Ghatkopar#* घाटकोपर Line 1 Elevated Island Operational from
8 June 2014
Transfer station to Ghatkopar railway station
Girgaon गिरगाव Aqua Line Underground Island Operational from 9 October 2025
Goregaon (East) गोरेगाव (पूर्व) Line 7 Elevated Side Operational from 19 January 2023
Goregaon (West) गोरेगाव (पश्चिम) Line 2A Elevated Side Operational from 19 January 2023
Grant Road†† ग्रँट रोड Aqua Line Underground Island Operational from 9 October 2025 Transfer station to Grant Road railway station
Gundavali* गुंदवली Line 7 Elevated Side Operational from 19 January 2023 Interchange with Line 1 on Western Express Highway
Hutatma Chowk हुतात्मा चौक Aqua Line Underground Island Operational from 9 October 2025
Jagannath Shankar Sheth†† जगन्नाथ शंकरशेठ Aqua Line Underground Island Operational from 9 October 2025 Transfer station to Mumbai Central railway station
Jagruti Nagar जागृती नगर Line 1 Elevated Side Operational from
8 June 2014
Jogeshwari (East) जोगेश्वरी (पूर्व) Line 7 Elevated Side Operational from 19 January 2023 Interchange with Line 6 on JVLR Junction
Kalbadevi काळबादेवी Aqua Line Underground Island Operational from 9 October 2025
Kandarpada कांदरपाडा Line 2A Elevated Side Operational from
2 April 2022
Kandivli (West) कांदिवली (पश्चिम) Line 2A Elevated Side Operational from
2 April 2022
Kurar कुरार Line 7 Elevated Side Operational from
2 April 2022
Lower Malad लोअर मालाड Line 2A Elevated Side Operational from 19 January 2023
Lower Oshiwara* लोअर ओशिवरा Line 2A Elevated Side Operational from 19 January 2023 Interchange with Line 6 on Adarsh Nagar (Mumbai)
Magathane मागाठाणे Line 7 Elevated Side Operational from
2 April 2022
Mahalaxmi†† महालक्ष्मी Aqua Line Underground Island Operational from 9 October 2025 Transfer station to Mahalaxmi railway station and Sant Gadge Maharaj Chowk monorail station
Malad (West) मालाड (पश्चिम) Line 2A Elevated Side Operational from 19 January 2023
Mandapeshwar मंडपेश्वर Line 2A Elevated Side Operational from
2 April 2022
Marol Naka* मरोळ नाका Line 1
Aqua Line
Elevated; underground Side and island Operational from 8 June 2014;
operational from 5 October 2024
MIDC - Andheri एम.आय.डी.सी. - अंधेरी Aqua Line Underground Island Operational from 5 October 2024
Mogra मोगरा Line 7 Elevated Side Operational from 19 January 2023
Oshiwara ओशिवरा Line 2A Elevated Side Operational from 19 January 2023
Ovaripada ओवरीपाडा Line 7 Elevated Side Operational from
2 April 2022
Poisar पोईसर Line 7 Elevated Side Operational from
2 April 2022
Rashtriya Udyan राष्ट्रीय उद्यान Line 7 Elevated Side Operational from
2 April 2022
Sahar Road सहार रोड Aqua Line Underground Island Operational from 5 October 2024
Saki Naka साकी नाका Line 1 Elevated Side Operational from
8 June 2014
Santacruz†† सांताक्रुझ Aqua Line Underground Island Operational from 5 October 2024 Transfer station to Santacruz railway station
Science Centre विज्ञान केंद्र Aqua Line Underground Island Operational from 9 October 2025
SEEPZ* सीप्झ Aqua Line Underground Island Operational from 5 October 2024
Shimpoli शिंपोली Line 2A Elevated Side Operational from
2 April 2022
Shitaladevi Mandir शितलादेवी मंदिर Aqua Line Underground Island Operational from 9 May 2025
Siddhivinayak सिद्धिविनायक Aqua Line Underground Island Operational from 9 May 2025
Valnai–Meeth Chowky वळनई–मीठ चौकी Line 2A Elevated Side Operational from 19 January 2023
Versova† वर्सोवा Line 1 Elevated Side Operational from
8 June 2014
Vidhan Bhavan विधान भवन Aqua Line Underground Island Operational from 9 October 2025
Western Express Highway* पश्चिम द्रुतगती महामार्ग Line 1 Elevated Side Operational from
8 June 2014
Interchange with Line 7 on Gundavali
Worli वरळी Aqua Line Underground Island Operational from 9 May 2025

Under construction

Station name Line Layout Platform layout Status Notes Refs
English Marathi
Adarsh Nagar (Mumbai)* आदर्श नगर (मुंबई) Line 6 Elevated Side Under construction Interchange with Line 2A on Lower Oshiwara
Airport Colony विमानतळ वसाहत Line 7 Elevated Side Under construction
Amar Mahal Junction अमर महल जंक्शन Line 4 Elevated Side Under construction
Anik Nagar Bus Depot आणिक नगर बस डेपो Line 4 Elevated Side Under construction
Anjur Phata अंजूर फाटा Line 5 Elevated Side Under construction
Bale बाळे Line 12 Elevated Side Under construction
Balkum Naka बाळकुम नाका Line 5 Elevated Side Under construction
Bandra†† वांद्रे Line 2B Elevated Side Under construction Transfer station to Bandra railway station
Bhakti Park (Wadala)#* भक्ती पार्क (वडाळा) Line 4
Line 11
Elevated Side Under construction Transfer station to Bhakti Park monorail station
Bhandup Mahapalika भांडुप महापालिका Line 4 Elevated Side Under construction
Bhandup†† भांडुप Line 4 Elevated Side Under construction Transfer station to Bhandup railway station
Bhiwandi भिवंडी Line 5 Elevated Side Under construction
BPT Hospital बी.पी.टी. रुग्णालय Line 11 Elevated Side Under construction
BSNL बी.एस.एन.एल. Line 2B Elevated Side Under construction
Cadbury Junction कॅडबरी जंक्शन Line 4 Elevated Side Under construction
Carnac Bunder कर्नाक टॉवर Line 11 Underground Island Under construction
Chembur†† चेंबूर Line 2B Elevated Side Under construction Transfer station to VNP and RC Marg Junction monorail station
Clock Tower घड्याळ टॉवर Line 11 Underground Island Under construction
Coal Bunder कोळसा बंदर Line 11 Underground Island Under construction
Darukhana दारूखाना Line 11 Underground Island Under construction
Dhamankar Naka धामणकर नाका Line 5 Elevated Side Under construction
Diamond Garden डायमंड गार्डन Line 2B Elevated Side Under construction
Dombivali MIDC डोंबिवली एमआयडीसी Line 12 Elevated Side Under construction
Dongripada डोंगरीपाडा Line 4 Elevated Side Under construction
Durgadi Fort दुर्गाडी किल्ला Line 5 Elevated Side Under construction
Eastern Express Highway पूर्व द्रुतगती महामार्ग Line 2B Elevated Side Under construction
ESIC Nagar ई.एस.आय.सी. नगर Line 2B Elevated Side Under construction
Gaimukh† गायमुख Line 4
Line 10
Elevated Side Under construction
Gaimukh Reti Bandar गायमुख रेतीबंदर Line 10 Elevated Side Under construction
Gandhi Nagar (Kanjurmarg)** गांधी नगर Line 4 Elevated Side Under construction Interchange with Line 6 on Kanjurmarg (West) and Transfer station to Kanjur Marg railway station
Ganesh Nagar (Kalyan) गणेश नगर (कल्याण) Line 12 Elevated Side Under construction
Ganesh Nagar (Wadala) गणेश नगर (वडाळा) Line 11 Elevated Side Under construction
Garodia Nagar गरोडिया नगर Line 4 Elevated Side Under construction
Godrej Company गोदरेज वसाहत Line 4 Elevated Side Under construction
Golavali गोळवली Line 12 Elevated Side Under construction
Gopal Nagar गोपाळ नगर Line 5 Elevated Side Under construction
Govegaon MIDC गोवेगाव एम.आय.डी.सी. Line 5 Elevated Side Under construction
Gowniwada गोवनीवाडा Line 4 Elevated Side Under construction
Hay Bunder हे बंदर Line 11 Underground Island Under construction
Hedutane हेदुटणे Line 12 Elevated Side Under construction
IIT Powai आय.आय.टी. पवई Line 6 Elevated Side Under construction
ILFS आय.एल. आणि एफ.एस. Line 2B Elevated Side Under construction
Income Tax Office* आयकर कार्यालय Line 2B Elevated Side Under construction Interchange with Aqua Line on Bandra Kurla Complex
Indira Nagar (Vile Parle) इंदिरा नगर Line 2B Elevated Side Under construction
Jogeshwari (West)†† जोगेश्वरी (पश्चिम) Line 6 Elevated Side Under construction Transfer station to Jogeshwari railway station
JVLR Junction* जे.व्ही.एल.आर. Line 6 Elevated Side Under construction Interchange with Line 7 on Jogeshwari East
Kalher काल्हेर Line 5 Elevated Side Under construction
Kalyan APMC† कल्याण ए.पी.एम.सी. Line 5
Line 12
Elevated Side Under construction
Kalyan Railway Station†† कल्याण रेल्वे स्थानक Line 5 Elevated Side Under construction Transfer station to Kalyan Junction railway station
Kanjurmarg (West)** कांजुर मार्ग Line 6 Elevated Side Under construction Interchange with Line 4 on Gandhi Nagar (Kanjurmarg) and Transfer station to Kanjur Marg railway station
Kapurbawdi†* कापूरबावडी Line 4
Line 5
Elevated Side Under construction
Kasarvadavali कासारवडवली Line 4 Elevated Side Under construction
Kasheli कशेळी Line 5 Elevated Side Under construction
Kashigaon काशिगाव Line 9 Elevated Side Under construction
Kashimira काशिमिरा Line 10 Elevated Side Under construction
Khira Nagar†† खिरा नगर Line 2B Elevated Side Under construction
Kolegaon कोळेगाव Line 12 Elevated Side Under construction
Kongaon कोनगाव Line 5 Elevated Side Under construction
Kurla (East)†† कुर्ला (पूर्व) Line 2B Elevated Side Under construction Transfer station to Kurla railway station and Lokmanya Tilak Terminus
Laxmi Nagar (Ghatkopar) लक्ष्मी नगर Line 4 Elevated Side Under construction
Mahakali Caves महाकाली गुहा Line 6 Elevated Side Under construction
Mahapalika Marg महापालिका मार्ग Line 4 Elevated Side Under construction
Majiwada माजिवडा Line 4 Elevated Side Under construction
Mandale† मंडाले Line 2B Elevated Side Under construction
Mankhurd†† मानखुर्द Line 2B Elevated Side Under construction Transfer station to Mankhurd railway station
Manpada (Dombivali East) मानपाडा (डोंबिवली) Line 12 Elevated Side Under construction
Manpada (Thane) मानपाडा (ठाणे) Line 4 Elevated Side Under construction
Deepak Hospital (Medtiya Nagar) मेडतिया नगर Line 9 Elevated Side and island Under construction
Miragaon* मिरागाव Line 9 Elevated Side Under construction Interchange with Line 10 on Shivaji Chowk (Mira Road)
MTNL एम.टी.एन.एल. Line 2B Elevated Side Under construction
Mulund Fire Station मुलुंड अग्निशमन केंद्र Line 4 Elevated Side Under construction
Mulund Naka मुलुंड नाका Line 4 Elevated Side Under construction
Nanavati Hospital नानावटी रुग्णालय Line 2B Elevated Side Under construction
National College (Bandra) राष्ट्रीय महाविद्यालय Line 2B Elevated Side Under construction
Naval Housing नौदल गृहनिर्माण Line 4 Elevated Side Under construction
Nilaje Gaon निळजे गाव Line 12 Elevated Side Under construction
Pandurang Wadi पांडुरंग वाडी Line 9 Elevated Side Under construction
Pant Nagar पंत नगर Line 4 Elevated Side Under construction
Pisarve Depot पिसार्वे डेपो Line 12 Elevated Side Under construction
Pisarve पिसार्वे Line 12 Elevated Side Under construction
Pisavali Gaon पिसवली गाव Line 12 Elevated Side Under construction
Powai Lake पवई तलाव Line 6 Elevated Side Under construction
Prem Nagar प्रेम नगर Line 2B Elevated Side Under construction
Purna पूर्णा Line 5 Elevated Side Under construction
Rajnouli Village रांजणोली Line 5 Elevated Side Under construction
Rambaug (Powai) रामबाग Line 6 Elevated Side Under construction
RTO Thane आर.टी.ओ. ठाणे Line 4 Elevated Side Under construction
SG Barve Marg एस.जी. बर्वे मार्ग Line 2B Elevated Side Under construction
Sagaon सागाव Line 12 Elevated Side Under construction
Sahajanand Chowk सहजानंद चौक Line 5 Elevated Side Under construction
Sai Baba Nagar साई बाबा नगर Line 9 Elevated Side Under construction
Saki Vihar Road साकी विहार Line 6 Elevated Side Under construction
Saraswat Nagar सारस्वत नगर Line 2B Elevated Side Under construction
SEEPZ Village* सीप्झ गाव Line 6 Elevated Side Under construction Interchange with Aqua Line on Aarey JVLR
Sewri†† शिवडी Line 11 Underground Island Under construction Transfer station to Sewri railway station
Shahid Bhagat Singh Garden शहीद भगतसिंग उद्यान Line 9 Elevated Side Under construction
Shangrila शांग्रीला Line 4 Elevated Side Under construction
Shivaji Chowk (Chembur) शिवाजी चौक (चेंबूर) Line 2B Elevated Side Under construction
Shivaji Chowk (Mira Road)†* शिवाजी चौक (मीरा रोड) Line 10
Line 13
Elevated Side Under construction Interchange with Line 9 on Miragaon
Shreyas Cinema श्रेयस सिनेमा Line 4 Elevated Side Under construction
Shyam Nagar (Mumbai) श्याम नगर (मुंबई) Line 6 Elevated Side Under construction
Siddharth Colony सिद्धार्थ वसाहत Line 4 Elevated Side Under construction
Sonapur सोनापूर Line 4 Elevated Side Under construction
Sonarpada सोनारपाडा Line 12 Elevated Side Under construction
Subhash Chandra Bose Stadium सुभाषचंद्र बोस स्टेडियम Line 9 Elevated Side Under construction
Suman Nagar सुमन नगर Line 4 Elevated Side Under construction
Surya Nagar सूर्य नगर Line 4 Elevated Side Under construction
Swami Samarth Nagar (Lokhandwala)† स्वामी समर्थ नगर Line 6 Elevated Side Under construction
Taloja†* तळोजा Line 12 Elevated Side Under construction Interchange with Line 1 (Navi Mumbai Metro) on Panchanand metro station
Teen Haath Naka (Thane) तीन हात नाका Line 4 Elevated Side Under construction
Temghar टेमघर Line 5 Elevated Side Under construction
Tikuji-ni-wadi टिकुजी-नी-वाडी Line 4 Elevated Side Under construction
Turbhe तुर्भे Line 12 Elevated Side Under construction
Vadavali वडवली Line 12 Elevated Side Under construction
Varsova Char Phata वर्सोवा चार फाटा Line 10 Elevated Side Under construction
Vijay Garden विजय गार्डन Line 4 Elevated Side Under construction
Vikhroli EEH† विक्रोळी ई.इ.एच. Line 6
Line 14
Elevated Side Under construction
Vikhroli†† विक्रोळी Line 4 Elevated Side Under construction Transfer station to Vikhroli railway station
Wadala Truck Terminal वडाळा ट्रक टर्मिनल Line 4 Elevated Side Under construction
Wadi Bunder वाडी बंदर Line 11 Elevated Island Under construction
Waklan वाकळण Line 12 Elevated Side Under construction

Statistics

Total number of metro stations 189
Total number of metro stations operational 68
Total number of metro stations under construction 121
Number of interchange stations 22
Number of elevated stations 155
Number of underground stations 33
Number of at-grade stations 1

See also

wikipedia, wiki, encyclopedia, book, library, article, read, free download, Information about List of Mumbai Metro stations, What is List of Mumbai Metro stations? What does List of Mumbai Metro stations mean?