List of bus rapid transit systems

The term bus rapid transit system (BRT system) has been applied to a wide range of bus, trolleybus, and electric bus systems. In 2012, the Institute for Transportation and Development Policy (ITDP) published a BRT Standard to make it easier to standardize and compare bus services.

The below list only includes BRT systems that are in operation or under construction.

Legend

Status (background color)
  • White: Operational
  • Light blue: Under construction
City
Primary city served by the buses and trolleybus.
System name
The English name of the bus rapid transit or overview article for city.
Operator
Operating the main bus services along its designated route.
Began
The year that the bus rapid transit began operating for passenger service.
Stations
Stations connected by transfers are counted as one station, unless otherwise note.
Length (km)
Track length; lines which share track are counted once or Corridor length; lines which sharing the same corridor are counted once.
Notes/Description
A short objective description and subjective of routes bus rapid transit ridership and passengers (daily).
Type
eBRT - Electric Bus Rapid Transit, using Trolleybuses or eBRT using Electric buses or other source.
BRT certified
ITDP standards-and-guides and bus-rapid-transit-standard year rewards.

Africa

Ethiopia

In the following table, BRT systems in light blue are under construction.

BRT systems in Ethiopia
City System name Began Lines Stations Length Notes/Description Type BRT certified
Addis Ababa - - 2 - 15.3 km (9.5 mi) Under construction Not BRT certified in 2024.

Egypt

BRT systems in  Egypt
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Cairo Cairo Bus Rapid Transit Ministry of Transportation 3 July 2025 1 14 35 km (22 mi) Ring Road with the Alexandria Agricultural Road to the Police Academy station. 1 June 2025 (trial operation) eBRT electric buses Not BRT certified in 2022.

Ghana

BRT systems in  Ghana
City System name Began Lines Stations Length Notes/Description Type BRT certified
Accra Aayalolo 25 November 2016 1 27 22 km (14 mi) It was initially planned as a bus transit system with dedicated lanes, but because these lanes were not provided it was renamed Quality Bus System (QBS). Not BRT certified in 2022.

Ivory Coast

In the following table, BRT systems in light blue are under construction.

BRT systems in Ivory Coast
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Abidjan - Abidjan Transport Company - - - - Under construction Not BRT certified in 2024.

Kenya

BRT systems in  Kenya
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Nairobi MRTS BRT Namata July 2022 1 - 20 km (12 mi) Not BRT certified in 2024.

Mayotte

In the following table, BRT systems in light blue are under construction.

BRT systems in Mayotte
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Mamoudzou CariBus T1 Line (fr) Dembeni-Mamoudzou Agglomeration Community (Cadema) - 3 - - Under construction Not BRT certified in 2022.

Morocco

BRT systems in  Morocco
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Marrakesh BRT Marrakesh City of Marrakesh 29 September 2017 1 8 8 km (5.0 mi) eBRT trolleybuses Not BRT certified in 2022.
Casablanca Casablanca Busway RATP Dev Casablanca 1 March 2024 2 42 24.5 km (15.2 mi) Not BRT certified in 2022.
Agadir Amalway Agadir Trambus (fr) Agadir Mobility SA 2024 1 35 15.5 km (9.6 mi) eBRT electric buses Not BRT certified in 2022.

Mozambique

In the following table, BRT systems in light blue are under construction.

BRT systems in Mozambique
City System name Began Lines Stations Length Notes/Description Type BRT certified
Maputo Maputo BRT - - - - Under construction Not BRT certified in 2024.

Nigeria

BRT systems in  Nigeria
City System name Region Began Lines Stations Length Notes/Description Type BRT certified
Lagos Lagos BRT Lagos Metropolitan Area Transport Authority (LAMATA) 17 March 2008 1 28 22 km (14 mi) The Lagos Metropolitan Area Transport Authority LAMATA BRT corridor is about 22 kilometres long.

The Nigerian government is building a BRT system for the Lagos Metropolitan Area, and the project's first phase has been completed.
The first phase, from mile 12 through Ikorodu Road and Funsho Williams Avenue to CMS.

Not BRT certified in 2016.
Oshodi - Abule-Egba BRT Lane Abule Egba - - - 13.65 km (8.48 mi) The first phase cost N4.5 billion (about US$35 million).
It included elevated segregation barriers, road repairs on bus and service lanes, de-silting of blocked drainage channels, and bus stops.
Not BRT certified in 2016.

Rwanda

In the following table, BRT systems in light blue are under construction.

BRT systems in Rwanda
City System name Began Lines Stations Length Notes/Description Type BRT certified
Kigali - - - - - Under construction Not BRT certified in 2024.

Senegal

BRT systems in  Senegal
City System name Began Lines Stations Length Notes/Description Type BRT certified
Dakar Sunu BRT 14 January 2024 2 23 18.3 km (11.4 mi) The Dakar, ongoing construction since 2019, delivery planned by the end of 2023. It will work together with the Train Express Regional Dakar-AIBD to improve the public transportation system around and in Dakar. eBRT electric buses Not BRT certified in 2022.

South Africa

In the following table, BRT systems in light blue are under construction.

BRT systems in  South Africa
City System name Region Began Lines Stations Length Notes/Description Type BRT certified
Cape Town MyCiTi City of Cape Town May 2010 36 42 120 km (75 mi) MyCiTi system began operations in May 2010, just before the World Cup. Its first service was a shuttle from the airport to the central business district. The initial Phase 1A trunk and feeder services began operation in May 2011. The remaining Phase 1A construction was completed in 2014, and phase 1B construction was completed in 2015. Bronze BRT certified (2013).
George Go George BRT Garden Route District Municipality August 2015 - - - Not BRT certified in 2022.
Johannesburg Rea Vaya City of Johannesburg 30 August 2009 - - 25.5 km (15.8 mi) Rea Vaya ("We're moving") line opened its first phase (Phase 1A) to the public on 30 August 2009, and BRT expansion is under construction; stations and roadworks are mainly completed or are in the final stages. The system was partially opened for the 2010 World Cup, with the full system linking most of Johannesburg from Soweto in the south to beyond Sandton in the north. Buses include those able to use the BRT stations and general bus stops, to be feeders for the network; others are articulated, and can only use BRT stations. Silver BRT certified (2013).
- - - 16.7 km (10.4 mi) The 120-km Phase 1 route includes 150 stations, eight terminals, and six depots. Phase 1A, consisting of a 40-km route with 48 stations, was completed in April 2009 (before the FIFA Confederations Cup); Phase 1B added 86 km and 102 stations to the system before the 2010 World Cup. According to the city's website, the system is fully integrated with other transport networks. Rea Vaya will not compete with other transport systems, such as the South African Rail Commuter Corporation or the Gautrain. Construction on the Rivonia-Katherine Corridor and bus stations underway. The Phase 1C route will connect downtown Johannesburg with Sandton Bronze BRT certified (2014).
Harambee BRT City of Ekurhuleni October 2017 - - - Not BRT certified in 2022.
Gqeberha Libhongolethu IPTS Nelson Mandela Bay 2010 - - - A BRT system was implemented by Libhongolethu IPTS in the city for the 2010 World Cup. Bus lanes have been built through the city, with buses built by Marcopolo. Not BRT certified in 2013.
Pretoria A Re Yeng BRT City of Tshwane December 2014 7 12 14 km (8.7 mi) The City of Tshwane, Construction began in July 2012, and the system was to be operational by A Re Yeng BRT bus from five in the morning to midnight. Not BRT certified in 2015.
Rustenburg Yarona BRT Bojanala Platinum District Municipality September 2022 - - - Not BRT certified in 2022.
Polokwane Leeto La Polokwane BRT Polokwane Local Municipality March 2021 - - - Not BRT certified in 2022.
Durban GO Durban BRT eThekwini Metropolitan Municipality - - - - Not BRT certified in 2024.
Bloemfontein Hauweng IPTN Mangaung Metropolitan Municipality 14 July 2024 3 - - Not BRT certified in 2024.

Tanzania

BRT systems in  Tanzania
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Dar es Salaam UDART UDA-RT 10 May 2016 1 29 21.1 km (13.1 mi) The Construction of the first phase was completed in December 2015 at a total cost of €134 million funded by the African Development Bank, World Bank and the Government of Tanzania. Not BRT certified in 2022.

Tunisia

In the following table, BRT systems in light blue are under construction.

BRT systems in Tunisia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Sfax - - - - - - Under construction Not BRT certified in 2024.

Uganda

In the following table, BRT systems in light blue are under construction.

BRT systems in Uganda
City System name Began Lines Stations Length Notes/Description Type BRT certified
Kampala Greater Kampala BRT - - - - Under construction

Asia

Afghanistan

BRT systems in Afghanistan
City System name Began Lines Stations Length Notes/Description Type BRT certified
Kabul Kabul BRT (Metrobus) July 2018 4 - 111 km (69 mi) Not BRT certified in 2022.

Azerbaijan

BRT systems in Azerbaijan
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Baku BakuBus BakuBus LLC 3 April 2014 5 - - Not BRT certified in 2022.

Bangladesh

BRT systems in Bangladesh
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Dhaka Dhaka BRT Dhaka Bus Rapid Transit Company Limited 2017 3 25 41 km (25 mi) Not BRT certified in 2022.

China

More than 30 projects are being implemented or studied in China's large cities. In the following table, BRT systems in light blue are under construction. Kunming developed the country's first BRT system in 1999.

BRT systems in China
City System name Chinese name Began Lines Stations Length Notes/Description Type BRT certified
Hangzhou Hangzhou BRT 杭州BRT 2006 2 50 55.4 km (34.4 mi) Not BRT certified in 2014.
Beijing Beijing BRT 北京BRT 2004 4 78 79.96 km (49.68 mi) Bronze BRT certified (2013).
Beijing Bus Rapid Transit Line 1 (zh) 2 January 2016 1 17 15.51 km (9.64 mi) eBRT trolleybuses
Beijing Bus Rapid Transit Line 2 (zh) 2017 1 20 16 km (9.9 mi)
Beijing Bus Rapid Transit Line 3 (zh) 15 January 2015 1 22 22.95 km (14.26 mi) eBRT trolleybuses
Beijing Bus Rapid Transit Line 4 (zh) 30 December 2012 1 19 25.5 km (15.8 mi)
Kunming Kunming BRT 昆明BRT 1999 5 63 56 km (35 mi) Not BRT certified in 2013.
Changzhou Changzhou BRT (zh) 常州BRT 2008 2 51 44 km (27 mi) Bronze BRT certified (2013).
Xiamen Xiamen BRT 厦门BRT 2008 3 31 67.4 km (41.9 mi) Sliver BRT certified (2014).
Jinan Jinan BRT (zh) 济南BRT 2008 6 46 56 km (35 mi) Bronze BRT certified (2013 & 2014).
Zaozhuang Zaozhuang BRT B1 枣庄BRT 2010 1 49 33.5 km (20.8 mi) Bronze BRT certified (2014).
Zaozhuang BRT B3 - 1 - 32.2 km (20.0 mi) Basic BRT certified (2014).
Zaozhuang BRT B5 - 1 - 18.5 km (11.5 mi)
Zhengzhou Zhengzhou BRT 郑州BRT 28 May 2009 5 97 70.3 km (43.7 mi) Bronze BRT certified (2014).
Zhengzhou BRT Route B2 1 January 2021 2 17 12.5 km (7.8 mi) eBRT trolleybuses
Guangzhou Guangzhou BRT 广州BRT 2010 1 26 22.5 km (14.0 mi) Gold BRT certified (2013).
Suzhou Suzhou BRT 苏州BRT 2008 5 106 95 km (59 mi) Not BRT certified in 2014.
Dalian Dalian BRT (zh) 大连BRT 2008 1 13 13 km (8.1 mi) Basic BRT certified (2014).
Hefei Hefei BRT (zh) 合肥BRT 2010 4 43 42 km (26 mi) Basic BRT certified in (2014).
Yancheng Yancheng BRT (zh) 盐城BRT 2010 2 33 33 km (21 mi) Bronze BRT certified (2014).
Ürümqi Ürümqi BRT 乌鲁木齐BRT 2011 4 66 42.2 km (26.2 mi) Bronze BRT certified (2014).
Changde Changde BRT 常德BRT 2012 1 25 20.9 km (13.0 mi) Basic BRT certified (2014).
Lianyungang Lianyungang BRT (zh) 连云港BRT 2012 1 29 34 km (21 mi) Bronze BRT certified (2014).
Lanzhou Lanzhou BRT 兰州BRT 2012 1 15 9.1 km (5.7 mi) Sliver BRT certified (2013).
Yinchuan Yinchuan BRT (zh) 银川BRT 2012 1 22 21.2 km (13.2 mi) Bronze BRT certified (2014).
Chengdu Chengdu BRT 成都BRT 2013 4 29 28.3 km (17.6 mi) Sliver BRT certified (2014).
Nanchang Nanchang BRT (zh) 南昌BRT 2015 4 - 63.1 km (39.2 mi) End of operation

2022

Not BRT certified in 2022.
Zhongshan Zhongshan BRT (zh) 中山BRT 2014 1 13 13 km (8.1 mi) Bronze BRT certified (2014).
Yichang Yichang BRT 宜昌BRT 2015 1 22 23 km (14 mi) Gold BRT certified (2014).
Wenzhou Wenzhou BRT (zh) 温州BRT 2015 1 17 13 km (8.1 mi) Not BRT certified in 2022.
Wuhan Wuhan BRT (zh) 武汉BRT 2016 1 14 13.6 km (8.5 mi) Not BRT certified in 2022.
Shanghai Yan'an Road Medium Capacity Bus Transit System 延安路中运量公交 1 February 2017 1 25 17.5 km (10.9 mi) eBRT trolleybuses Not BRT certified in 2022.
Fengpu Express 奉浦快线 2018 1 12 20.3 km (12.6 mi) Not BRT certified in 2014.
Guiyang Guiyang BRT (zh) 贵阳BRT 2017 1 24 29 km (18 mi) Not BRT certified in 2022.
Hohhot Hohhot BRT 呼和浩特BRT 2017 1 40 47 km (29 mi) Hohhot bus rapid transit has now ceased operations. Not BRT certified in 2022.
Yiwu Yiwu BRT 义乌 BRT 2017 1 17 12.1 km (7.5 mi) Not BRT certified in 2022.
Linyi Linyi BRT 临沂 BRT 2017 1 14 12.3 km (7.6 mi) Not BRT certified in 2014.
Nanning Nanning BRT 南宁BRT 2017 2 33 27 km (17 mi) Not BRT certified in 2014.
Fuzhou (Jiangxi) Fuzhou BRT 抚州BRT 2019 1 18 18.5 km (11.5 mi) Not BRT certified in 2022.
Zigong Zigong BRT 自贡BRT 2021 June 1 - - Not BRT certified in 2022.
Shenzhen Shenzhen BRT 深圳BRT - - - -
Wuxi Wuxi BRT 无锡BRT - - - -
Xi'an Xi'an BRT 西安BRT - - - -
Shenyang Shenyang BRT 沈阳BRT - - - -
Shijiazhuang Shijiazhuang BRT 石家庄BRT - - - -
Harbin Harbin BRT 哈尔滨BRT - - - -
  1. Stations connected by transfers are counted as one station, unless otherwise noted.
  2. Corridor length; lines which sharing the same corridor are counted once.
  3. Portions (BRT 1 33.4 km, BRT 1 Interchange 18.7 km and BRT 2 15.3 km) are on dedicated, elevated roads.
  4. Portions (B7 Xierhuan corridor 7.1 km, Beiyuan Dajie 15.0 km, Erhuandonglu 8.0 km, Lishan Lu 4.8 km, Gongyebeilu-Aotizonglu Line 6 6.6 km) are on dedicated, six line on corridor.

Georgia

BRT systems in Georgia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Tbilisi - - - - - - Vake district and Ilia Chavchavadze Avenue pilot BRT project, completed in 2020-2022.[citation needed]

India

Government-designated BRT systems (BRTS) with segregated lanes: India is rapidly building new BRTS systems around the country. Several systems are operational while many are under construction and are also proposed.

In the following table, BRT systems in light blue are under construction.

BRT systems in India
City System name Native name Acronym Began Lines Stations Length Notes/Description Type BRT certified
Pune Rainbow BRTS रेनबो जलद बस परिवहन PNBRTS 2006 6 102 114 km (71 mi) Basic BRT certified (2016).
Ahmedabad Ahmedabad BRTS અમદાવાદ BRT AHMDBRTS 2009 14 150 89 km (55 mi) 1 Silver + 2 Bronze BRT certified (2013 & 2014).
Janmarg - RTO-Maninagar - - - 21.5 km (13.4 mi) Bronze BRT certified (2013).
Janmarg - Narol-Naroda - - - 13.2 km (8.2 mi) Silver BRT certified (2013).
Janmarg - Sola-AEC - - - 3.1 km (1.9 mi) Bronze BRT certified (2014).
Indore Indore BRTS इंदौर BRTS INDBRTS 2013 10 21 126.46 km (78.58 mi) Bronze BRT certified (2016).
Rajkot Rajkot BRTS રાજકોટ BRT RAJBRTS 2008 1 18 10.5 km (6.5 mi) Not BRT certified in 2013.
Surat Surat BRTS સુરત BRT SURBRTS 2013 15 148 114 km (71 mi) Bronze BRT certified (2014).
Bhopal Bhopal BRTS भोपाल BRTS BHPBRTS 2006 10 230 186 km (116 mi) The process of dismantling the corridor began on 20 January 2024 the line is close Not BRT certified in 2013.
Jaipur Jaipur BRTS जयपुर BRTS JAIBRTS 2010 1 10 7.1 km (4.4 mi) Not BRT certified in 2014.
New Delhi Delhi BRTS - - 20 April 2008 3 - 115.5 km (71.8 mi) Ended operation on 19 January 2016. Basic BRT certified (2013).
Mumbai Mumbai BRTS मुंबई जलद बस परिवहन Planned - 1(Planned) - -
Bhubaneswar Bhubaneswar BRTS ଭୁବନେଶ୍ୱର BRTS Planned 2019 2(Planned) - -
Hyderabad Hyderabad BRTS హైదరాబాద్ BRTS SZBRT Planned 2(Planned) - -
Jodhpur Jodhpur BRTS जोधपुर BRTS JodhpurBRTS 15 January 2016 1 6 10 km (6.2 mi) Ended operation closed and suspended in January 2021. Not BRT certified in 2019.
Amritsar Amritsar BRTS ਅੰਮ੍ਰਿਤਸਰ BRTS AMRSTRBRTS 2018 7 84 46 km (29 mi) Not BRT certified in 2019.
Vijayawada Vijayawada BRTS విజయవాడ BRT VJWDABRTS - 6 - -
Hubli–Dharwad Hubli–Dharwad BRTS ಚಿಗರಿ HDBRTS 1 November 2018 6 33 70 km (43 mi) Not BRT certified in 2022.
Raipur-Naya Raipur Raipur and Naya Raipur BRTS रायपुर-नया रायपुर BRTS - 2016 2 10 40 km (25 mi) Not BRT certified in 2022.
Visakhapatnam Visakhapatnam BRTS విశాఖపట్నం BRTS - 2016 2 - 42 km (26 mi) Not BRT certified in 2022.

Indonesia

BRT systems in Indonesia
City System name Began Lines Stations Length Passengers (daily) Notes/Description Type BRT certified
Bali Trans Metro Dewata (id) 7 September 2020 5 - - - Stopped operating 31 December 2024. Not BRT certified in 2014.
Balikpapan Balikpapan City Transit (id) 8 July 2024 3 - - - Not BRT certified in 2024.
Banjarmasin metropolitan area BRT Banjarbakula (Tayo bus) 14 August 2019 3 37 - - Not BRT certified in 2022.
Green Tayo 1 February 2022 4 - - 6,000
Trans Banjarmasin (id) 17 February 2020 4 - - -
Banyumas Regency Trans Banyumas (id) 5 December 2021 4 - - - Not BRT certified in 2022.
Bekasi Our Trans Bekasi Patriot Bus (id) 3 March 2024 1 47 - - Not BRT certified in 2024.
Our Trans Wibawa Mukti Bus (id) 1 December 2024 1 58 - -
Bogor Our Bus Trans Pakuan (id) 2 December 2021 4 120 - - Not BRT certified in 2022.
Central Java Trans Central Java (id) 7 July 2017 4 - - 6,506,462 Not BRT certified in 2022.
Cirebon Trans Cirebon - - - - -
Depok Our Bus Trans Depok (id) 1 July 2024 1 50 - - Not BRT certified in 2024.
East Java Trans East Java 19 August 2022 5 - 75 km (47 mi) - Not BRT certified in 2022.
Jakarta Jakarta BRT 15 January 2004 13 244 264.6 km (164.4 mi) 1,006,579 Transjakarta is the longest BRT network in the world (251.2 km), carries more than 1 million passengers daily with a fleet of over 3,900 buses. Despite being branded as BRT systems, practically all bus networks in Indonesia except for Transjakarta does not have right of way. eBRT electric buses Sliver BRT certified (2014).
- - - 12.9 km (8.0 mi) - Transjakarta - Corridor 1 Bronze BRT certified (2013).
Jayapura Trans Jayapura 18 December 2019 4 4 - - Not BRT certified in 2022.
Batam Trans Metro Batam 24 September 2004 8 39 - - Not BRT certified in 2014.
Yogyakarta Trans Jogja 17 February 2008 11 267 - 20,000 Not BRT certified in 2014.
Pekanbaru Trans Metro Pekanbaru (id) 18 June 2009 10 80 - - Not BRT certified in 2014.
Bandung metropolitan area Trans Metro Bandung (id) 23 September 2009 5 52 - - Not BRT certified in 2014.
Metro Jabar Trans 21 December 2021 5 - - - Not BRT certified in 2022.
Palembang Trans Musi Jaya (id) January 2010 6 129 156 km (97 mi) 22,000 Not BRT certified in 2014.
Surakarta Batik Solo Trans 1 September 2010 8 72 - 10,000 Not BRT certified in 2014.
Semarang Trans Semarang 1 October 2010 8 35 - 33,000 Not BRT certified in 2014.
Denpasar metropolitan area Trans Sarbagita 18 August 2011 4 31 42 km (26 mi) 5,000 Not BRT certified in 2014.
Bandar Lampung Trans Lampung (id) 14 November 2011 3 30 - - Not BRT certified in 2014.
Padang Trans Padang (id) January 2014 2 26 42 km (26 mi) 10,000 Not BRT certified in 2014.
Palangka Raya Trans Palangka Raya 2 February 2018 5 26 - - Not BRT certified in 2022.
Palu Trans Palu (id) 1 October 2024 4 - - - Not BRT certified in 2024.
Pontianak Trans Pontianak Equator (id) 3 February 2017 1 - - - Not BRT certified in 2022.
Makassar metropolitan area Trans Mamminasata (id) March 2014 11 154 - - Not BRT certified in 2014.
Banda Aceh Trans Koetaradja (id) 2 May 2016 5 90 - 15,342 Not BRT certified in 2022.
Surabaya metropolitan area Suroboyo Bus 7 April 2018 9 - - 4,432 Not BRT certified in 2022.
Trans Semanggi Suroboyo 29 December 2021 2 - - - Not BRT certified in 2022.
Medan metropolitan area Trans Mebidang (id) 2015 2 - 55 km (34 mi) - Not BRT certified in 2016.
Trans Metro Deli (id) 22 November 2020 5 - - - Not BRT certified in 2022.
Bus Listrik Medan (id) 4 January 2024 5 31 10.5 km (6.5 mi) - eBRT electric buses Not BRT certified in 2024.

Iran

BRT systems in Iran
City System name Began Lines Stations Length Notes/Description Type BRT certified
Tehran Tehran BRT 2008 10 - 179 km (111 mi) Not BRT certified in 2022.
Tabriz Tabriz BRT 2009 2 - 18 km (11 mi)
Shiraz Shiraz BRT - 4 - -
Isfahan Isfahan BRT 2013 3 33 17 km (11 mi)
Kerman Kerman BRT - 2 - -
Mashhad Mashad BRT - 5 - -
Karaj Karaj BRT - 1 - -

Israel

BRT systems in Israel
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Haifa Metronit Superbus August 2013 5 152 60 km (37 mi) Not BRT certified in 2022.
Jerusalem - Egged Transportation - 6 - - Six lines 71, 72, 74, 75, 77, 78 Not BRT certified in 2022.
Ashdod - - - 2 - - Two lines 1, 10 Not BRT certified in 2022.

Japan

BRT systems in Japan
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Ibaraki Hitachi BRT (ja) Ibaraki Transportation (ja) (Kashitetsu Bus) Kantetsu Green Bus. 25 March 2013 1 - 8.5 km (5.3 mi) Ishioka Station-Ibaraki Airport, Hokota Station Not BRT certified in 2022.
Kesennuma Minami-Kesennuma Station Kesennuma Line 11 February 1957 1 17 21.7 km (13.5 mi) Ofunato Lines, Inter-city railway converted to single-lane BRT after the 2011 Tōhoku earthquake and tsunami. Closed on 11 March 2011
Nagoya Yutorito Line - 23 March 2001 1 9 6.5 km (4.0 mi)
Niigata Prefecture Bandai-bashi Line - 5 September 2015 1 7 7 km (4.3 mi)
Shirakawa, Fukushima Hakuhō Line - 8 October 1916 1 11 23.3 km (14.5 mi)
Tokyo Tokyo BRT - 7 August 2019 1 13 - Started pre-service by 24 May 2020, and full operations by 2022.
Soeda, Fukuoka Fukuoka BRT (ja) Nishitetsu 8 August 2016 1 - -
Kobe Port Loop (ja) Shinki Bus 1 April 2021 1 13 13 km (8.1 mi)
Kitakyushu Kitakyushu BRT (ja) - 22 July 2019 - - -
Fukuoka Prefecture Hitahikosan Line BRT (ja) JR Bus Kyushu Company 28 August 2023 1 36 37.7 km (23.4 mi)

Jordan

BRT systems in Jordan
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Amman Amman Bus Rapid Transit Gursel - CMTC 27 July 2021 2 34 25 km (16 mi) Amman Bus Rapid Transit began operation partially in 2021. Phase one has three routes: Route 98, Route 99, and Route 100. Phase two is expected to begin operation in 2022. Not BRT certified in 2024.
Zarqa Amman-Zarqa Bus Rapid Transit - 15 May 2024 1 6 20 km (12 mi) Not BRT certified in 2024.

Kazakhstan

In the following table, BRT systems in light blue are under construction.

BRT systems in Kazakhstan
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Almaty Almaty BRT - - - - 102 km (63 mi) Almaty Bus Rapid Transit project started in 2014, now operational, 102 km under construction or approved. The first post-Soviet BRT.

Laos

In the following table, BRT systems in light blue are under construction.

BRT systems in Laos
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Vientiane - - - - - - Under construction

Lebanon

In the following table, BRT systems in light blue are under construction.

BRT systems in Lebanon
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Beirut - - - - - - Under construction

Malaysia

BRT systems in Malaysia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Kuala Lumpur BRT Sunway Line Rapid Bus 2 June 2015 1 7 5.4 km (3.4 mi) Malaysia's first BRT system, is 5.4 km long and connects major areas of Bandar Sunway on a dedicated, elevated road. It is Asia's first electric BRT system. eBRT electric buses Not BRT certified in 2022.
Iskandar Puteri Iskandar Malaysia Bus Rapid Transit Handal Indah (Causeway Link), Maju, S&S International, Transit Link (City Bus) Shelved 72 32 51 km (32 mi) It will be the second BRT system to be develop in Malaysia with 51 km in length consist of 3 trunk routes for Tebrau, Skudai and Iskandar Puteri corridors. Not BRT certified in 2022.

Myanmar

BRT systems in Myanmar
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Yangon Yangon BRT - 9 February 2016 2 22 - The BRT line consists of two line yellow line and blue line connecting to Pyay Rd and Insein Road to central town of Yangon. Not BRT certified in 2022.

Pakistan

BRT systems in  Pakistan
City System name Region Began Lines Stations Length Notes/Description Type BRT certified
Lahore Lahore Metrobus Punjab 11 February 2013 - 27 27 km (17 mi) BRT certified (2014)
Rawalpindi and Islamabad Rawalpindi-Islamabad Metrobus Punjab and ICT 4 June 2015 4 52 83.6 km (51.9 mi) Bronze BRT Certified (2014)
Multan Multan Metrobus Punjab 24 January 2017 - 21 18.5 km (11.5 mi) Not BRT Certified (2022)
Peshawar TransPeshawar Khyber Pakhtunkhwa 13 August 2020 16 32 27 km (17 mi) Gold BRT Certified (2016)
Karachi Karachi Breeze Sindh 2021 6 22 112.9 km (70.2 mi) Not BRT Certified (2022)
Faisalabad Faisalabad Metrobus Punjab 2025 - 40 70 km

(43.5 mi)

- Gold BRT

Philippines

In the following table, BRT systems in light blue are under construction.

BRT systems in Philippines
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Manila EDSA Busway Metropolitan Manila Development Authority and Department of Transportation 1 July 2020 1 23 28 km (17 mi) Not BRT certified as of 2022.
Cavite Lancaster New City Link (LNC Link) - January 2013 6 8 - Not BRT certified as of 2022.
New Clark City Clark Loop - December 2019 4 - - Not BRT certified as of 2022.
Cebu City Cebu Bus Rapid Transit System - - 1 17 13.6 km (8.5 mi) Under construction Not BRT certified in 2024.
Davao City Davao Bus Project - - 29 - - Under construction Not BRT certified in 2024.

Saudi Arabia

BRT systems in Saudi Arabia
City System name Began Lines Stations Length Notes/Description Type BRT certified
Riyadh Riyadh Bus 19 March 2023 3 2,900 1,905 km (1,184 mi) Not BRT certified in 2022.

South Korea

BRT systems in South Korea
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Busan Busan BRT Seomyeon-Jagalchi Central BRT 2016 - - 7.9 km (4.9 mi) Not BRT certified in 2022.
Daejeon-Osong Daejeon BRT (ko) Utilizing Sejong dedicated corridor 20 July 2016 - - -
Sejong Barota BRT (ko) - 1 June 2012 7 - 23.4 km (14.5 mi) Bronze BRT certified (2016).
Express Intercity B1/B2 Sejongosong-ro - - - - Not BRT certified in 2022.
Goyang-Susaek (Seoul) Goyang Express Bus System (ko) 0 - Susack BRT April 2010 22 54 15.6 km (9.7 mi) First BRT in South Korea with bus priority signal system. BRT certified (2014)
Hanam-Cheonho (Seoul) Hanam Express Bus System (ko) 0 - Cheonho-Daero - East 19 March 2011 - - 10.5 km (6.5 mi) BRT certified (2014)
0 - Cheonho-Daero - West - - - 5.4 km (3.4 mi)
Cheongna International City-Gangseo (Seoul) Cheongna~Gangseo BRT (ko) - 11 July 2013 12 - 47.6 km (29.6 mi) BRT certified (2014)
Cheongna GRT (BRT) (ko) - 5 February 2018 2 16 19.7 km (12.2 mi) (701 and 702) Bustram BRT certified (2014)
Seoul Korea BRT (ko) Seoul Express Bus Terminal (0 - Gangnam-Daero) 9 June 2004 122 329 4.7 km (2.9 mi) BRT certified (2014)
0 - Dongsomun-ro/Dobong-ro - - - 14.3 km (8.9 mi)
0 - Gyeongin-ro - - - 5.6 km (3.5 mi)
0 - Yeouidaebang-ro/Siheung-daero - - - 9.5 km (5.9 mi)

Taiwan

BRT systems in Taiwan
City System name Operator Began Closed Lines Stations Length Notes/Description Type BRT certified
Taipei Taipei Joint Bus System 15 Civil operation bus transports 1997 - 16 - 60 km (37 mi) Dedicated bus lanes, constructed starting in 1996, which include many BRT features, such as raised station platforms.They are used by the Taipei Joint Bus System, including a system of 16 trunk lines that aim to provide "MRT-like" service along arterial roads, with peak headways of four to six minutes. Not BRT certified in 2014.
Chiayi City Chiayi Bus Rapid Transit Chiayi Bus Company 2008 - 3 18 29.7 km (18.5 mi) Two routes: 7211 (between Chiayi City Centre and Puzi) and 7212, between the Chiayi TRA station and the Chiayi HSR station. Not BRT certified in 2014.
Taichung Taichung BRT - 28 July 2014 8 July 2015 1 21 17.1 km (10.6 mi) "Optimized Bus Lane" It is still using most of the facilities built in BRT era; only the priority bus signals were cancelled. Not BRT certified in 2014.

Thailand

BRT systems in Thailand
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Bangkok Bangkok BRT Bangkok Mass Transit System Public Company Limited 23 May 2010 5 14 16.5 km (10.3 mi) The route begins at Sathon and runs along Narathiwat Ratchanakharin Road, turns right at Rama III Road, crosses the Chao Phraya River on the Rama III Bridge and follows Ratchadaphisek Road before turning right at Ratchahruek Road. At the Sathon-Narathiwat Ratchanakharin intersection, a walkway connects BRT Sathon and the BTS Chong Nonsi station. Bronze BRT certified (2014).

Turkey

BRT systems in Turkey
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Istanbul Metrobus İETT 17 September 2007 1 44 52 km (32 mi) Tuyap and Söğütlüçeşme, is Turkey first full-service bus rapid transit system. It has a fully separated right-of-way (except crossing the Bosphorus Bridge) and off-bus fare collection. Silver BRT certified (2014).
Malatya Malatya Trambus (tr) Motas 10 March 2015 - 53 20 km (12 mi) Trambus is a mixed-traffic BRT system with bi-articulated trolleybuses. eBRT trolleybuses Not BRT certified in 2022.
Urfa (Sanliurfa) Trambus (Sanliurfa) (tr) - 28 April 2023 1 63 7.7 km (4.8 mi) Sanliurfa city implemented trolleybus on bus rapid transit. eBRT trolleybuses Not BRT certified in 2024.

United Arab Emirates

In the following table, BRT systems in light blue are under construction.

BRT systems in United Arab Emirates
City System name Began Lines Stations Length Notes/Description Type BRT certified
Dubai EB1 - - - - Under construction eBRT electric buses Not BRT certified in 2022.

Vietnam

BRT systems in Vietnam
City System name Began Lines Stations Length Notes/Description Type BRT certified
Hanoi Hanoi BRT 31 December 2016 1 23 14.5 km (9.0 mi) System runs from the downtown Kim Mã terminal to the Yên Nghĩa terminal in Hanoi's southern suburbs.The system is a component of the Hanoi Urban Transport Development Project, which was approved by the Hanoi People's Committee in Decision 1837/QĐ-UBND on May 10, 2007. The World Bank-funded ODA project is a step in improving the city's urban transport network and increasing public-transport capacity. Not BRT certified in 2022.

Europe

Austria

In the following table, BRT systems in light blue are under construction.

BRT systems in  Austria
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Vienna - - - - - - Entire bus system includes many BRT features such as stop distancing, place name signs on all bus stop signs, all door boarding and an entirely proof of payment, off-board fare collection system. Not BRT certified in 2022.

Belgium

BRT systems in  Belgium
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Liège Charleroi BRT (fr) Opérateur de transport de Wallonie (TEC) 1968 30 16 6 km (3.7 mi) Busway which was documented in a Transport Research Laboratory video. Not BRT certified in 2022.

Denmark

BRT systems in  Denmark
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Aalborg Plusbus (da) - 23 September 2023 2 22 12 km (7.5 mi) Launch it first "Plusbus" BRT in the city. It is a 12 km route from the eastern to the western most part of the city; 1 km yet to be finalized.
It features bus exclusive lanes, all electric buses, each 25 meters long and with room for 153 passengers, and priority at all intersections on the route.
eBRT electric buses Not BRT certified in 2022.

Finland

In the following table, BRT systems in light blue are under construction.

BRT systems in  Finland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Helsinki The Jokeri line (fi) (Bussi-Jokeri Runkolinja 556) Helsinki Regional Transport Authority 10 August 2015 1 35 27.5 km (17.1 mi) Runkolinja 550 (fi) close on 29 December 2023. Not BRT certified in 2022.
Tampere - - - - - - BRT in their city[clarification needed] (still under construction)
Turku - - - - - - Have extensive bus-lane networks in their city centers.[clarification needed]

France

Bus à haut niveau de service (BHNS) in French - High-level bus service in English

In the following table, BRT systems in light blue are under construction.

BRT systems in  France
City System name French name Began Lines Stations Length Notes/Description Type BRT certified
Aix-en-Provence BHNS Aixpress (fr) BHNS Aixpress 2 September 2019 6 19 7.2 km (4.5 mi) eBRT electric buses Not BRT certified in 2022.
Antibes Envibus Line A (fr) BHNS Antibes 6 January 2020 76 35 -
Amiens Ametis Nemo 1 (fr) BHNS Amiens 11 May 2019 4 37 15.7 km (9.8 mi) eBRT electric buses
Angoulême Réseau Möbius (fr) BHNS Angoulême 2 September 2019 49 - 20 km (12 mi)
Annemasse TAC Tango (fr) BHNS Annemasse 15 December 2019 8 14 7.5 km (4.7 mi)
Avignon Chrono'hop (fr) BHNS Chrono'hop 19 October 2019 2 56 25 km (16 mi)
Bayonne Tram Bus Line T1 (fr) BHNS Bayonne 2 September 2019 3 33 - eBRT electric buses
Belfort BHNS Optymo (fr) BHNS Optymo phase II 26 August 2013 5 15 7.6 km (4.7 mi)
Besançon Besançon BRT (fr) BHNS Besançon 2 September 2017 1 - 4.1 km (2.5 mi) Route of line 3
Bordeaux Bordeaux express bus line G BHNS Bordeaux 2024 1 42 21 km (13 mi) Under construction
Brest Brest BRT (fr) Brest BHNS - - - - Line D under construction
Cannes Le Palm Bus Express BRT BHNS Cannes 2013 2 25 11 km (6.8 mi) Not BRT certified in 2022.
Chalon-sur-Saône BRT Flash BHNS Chalon-sur-Saône 2012 1 15 6 km (3.7 mi) Not BRT certified in 2022.
Clermont-Ferrand Line B of the Clermont-Ferrand T2C network (fr) Clermont-Ferrand BHNS 8 December 2012 - - 5.8 km (3.6 mi) Line B of the Clermont-Ferrand BHNS, Lines B (Royat to Stade Marcel Michelin) Not BRT certified in 2022.
Line C of the Clermont-Ferrand BHNS (fr) 13 January 2014 - - 17.5 km (10.9 mi) Line C of the Clermont-Ferrand BHNS, Lines C (Tamaris to Cournon-d'Auvergne)
Dijon Divia Mobilitès (fr) BHNS Dijon 25 October 2004 36 1090 - Not BRT certified in 2022.
Douai Évéole (fr) BHNS Douai 8 February 2010 1 37 34 km (21 mi) Évéole is the public transport network used guided busway APTS Phileas (fr) Not BRT certified in 2022.
Douai High-Level Service Bus (fr) (Évéa) 18.7 km (11.6 mi)
Évry TICE (fr) BHNS TICE 31 December 2023 25 31 18 km (11 mi) TICE has a segregated, elevated system. France's first line (1975). Not BRT certified in 2022.
La Rochelle ILLICO BRT Line (fr) (Yélo Network) BHNS La Rochelle 2009 1 2 6 km (3.7 mi) Not BRT certified in 2022.
Le Mans Line T3 of the BHNS of Le Mans (fr)(SETRAM) BHNS Le Mans 20 February 2016 1 12 7.2 km (4.5 mi) Line T3 of the BHNS of Le Mans Not BRT certified in 2022.
Lille Lille Metropole Lianas (fr) BHNS Lille 28 January 2008 13 121 67 km (42 mi) Not BRT certified in 2022.
Lens and Béthune Tadao BHNS Lens 2003 67 - - Bubble Lines Not BRT certified in 2022.
Lorient BRT Triskell BHLS (fr) BHNS Lorient 2007 6 43 14 km (8.7 mi) Not BRT certified in 2022.
Lyon Lyon trolleybus line C1 (fr) BHNS Lyon 12 October 2006 2 7 8.4 km (5.2 mi) Trolleybuses in Lyon (Line C1 and C2 and C3) eBRT trolleybuses Not BRT certified in 2022.
Lyon trolleybus line C2 (fr) 29 August 2011 4 10 12.1 km (7.5 mi)
Lyon trolleybus line C3 (fr) 30 October 2007 3 17 12 km (7.5 mi)
Marseille Marseille RTM (fr) BHNS de Lille - 5 - - Très Grands Bus (TGB lines) Not BRT certified in 2022.
Maubeuge BHLS - Viavil - 2008 1 14 8.4 km (5.2 mi) Busway lines of the du Stibus network Not BRT certified in 2022.
Metz BRT Mettis (fr) BHNS Mettis 5 October 2013 2 47 17.8 km (11.1 mi) A and B Line Not BRT certified in 2022.
Line A of the Mettis of Metz (fr) 2 26 12.5 km (7.8 mi)
Line B of the Mettis de Metz (fr) 3 22 11 km (6.8 mi)
Line C of the Mettis of Metz (fr) - 3 21 10 km (6.2 mi) Under Construction still 2027
Montpellier Bustram of Montpellier (fr) BHNS Montpellier 23 May 2025 5 105 57 km (35 mi) Not BRT certified in 2025.
Mulhouse BRT Mulhouse (fr) BHNS Mulhouse 2 September 2013 1 16 8.7 km (5.4 mi) Not BRT certified in 2022.
Nancy Trolleybuses in Nancy BHNS Nancy 5 April 2025 1 25 10 km (6.2 mi) Trolleybuses Line T1: Essey-lès-Nancy, Mouzimpré to Vandœuvre, Brabois-Hôpitaux eBRT trolleybuses Not BRT certified in 2025.
BRT Tempo Lines (fr) BHNS Nancy 24 August 2013 3 128 45.6 km (28.3 mi) Tempo Line T2: Laneuveville-devant-Nancy Centre to Laxou Sapinière,

Line T3: Seichamps Haie Cerlin to Villers Campus Sciences, Line T4: Houdemont Porte Sud to reach Laxou Champ-le-Bœuf.

Not BRT certified in 2022.
Nantes Nantes Busway BHNS Nantes 6 November 2006 2 30 13 km (8.1 mi) eBRT electric buses Bronze BRT certified (2013).
Nîmes BRT Tango+ (fr) BHNS Tango+ 29 September 2012 1 9 7.2 km (4.5 mi) Line T1 and line T2 Bronze BRT certified (2013).
Nîmes Bus Rapid Transit Line T2 (fr) 7 January 2020 1 17 6.7 km (4.2 mi)
Paris, Île-de-France Trans-Val-de-Marne (TVM) - 1 October 1993 2 32 19 km (12 mi) Operated by RATP. It was the second BRT system implemented in France during the 1980s; for political reasons, there are no bus lanes through Saint-Maur-des-Fossés. BRT certified with Silver Excellence (2014).
RATP bus line 393 (fr) - 10 September 2011 1 10 11 km (6.8 mi) Créteil 393 is also operated by RATP. Shares bus lane and stations with TVM for five kilometres. Not BRT certified in 2022.
T Zen BHNS T Zen 4 July 2011 1 14 14.7 km (9.1 mi) Tzen 1 Not BRT certified in 2022.
Pau BRT FÉBUS (fr) BHNS FÉBUS 8 July 2019 1 14 6 km (3.7 mi) Not BRT certified in 2022.
Rennes BRT Rennes Trambus (fr) BHNS Rennes - 4 100 55 km (34 mi) Under construction Not BRT certified in 2022.
Rouen TEOR - 12 February 2001 4 65 39 km (24 mi) T1, T2, T3 lines Silver BRT certified (2013).
Saint-Nazaire BRT Helyce (fr) BHNS Hélyce 3 September 2012 2 20 9 km (5.6 mi) Not BRT certified in 2022.
Sophia Antipolis BRT TEO (fr) BHNS Saint-Brieuc - - - 8 km (5.0 mi) Bus-Tram Not BRT certified in 2022.
Strasbourg Line G of the Strasbourg BHNS (fr) Strasbourg BHNS 30 November 2013 2 34 13.2 km (8.2 mi) Line G of the Strasbourg BHNS (Gare Centrale–Espace Européen de l'Entreprise) Not BRT certified in 2022.
Line H of the Strasbourg BHNS (fr) 24 February 2020 2 10 3.2 km (2.0 mi)
Toulouse Linéo (fr) BHNS Toulouse 2008 2 17 11 km (6.8 mi) Not BRT certified in 2022.
Tours Line 2 Tempo (fr) BHNS Tours 31 August 2013 2 35 15.9 km (9.9 mi) Line 2 Tempo Not BRT certified in 2022.

Germany

BRT systems in  Germany
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Essen Spurbus (de) Essen Transport AG (de) 1980 2 - 24.2 km (15.0 mi) Guided buses use a busway in the center of a motorway. Not BRT certified in 2014.
Oberhausen Oberhausen route 112 (de) Stadtwerke Oberhausen 2 June 1996 1 6 6.8 km (4.2 mi) Not BRT certified in 2014.

Greece

In the following table, BRT systems in light blue are under construction.

BRT systems in  Greece
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Athens - - - - - - Thermal Bus Company Not BRT certified in 2024.
Thessaloniki - OASTH 6 August 1957 85 4 - Not BRT certified in 2014.

Iceland

In the following table, BRT systems in light blue are under construction.

BRT systems in Iceland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Reykjavík Borgarlína - - - - - Under construction until 2026

Italy

In the following table, BRT systems in light blue are under construction.

BRT systems in  Italy
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Rimini and Riccione Metromare Start Romagna SpA 23 November 2019 1 17 9.8 km (6.1 mi) eBRT trolleybuses Not BRT certified in 2022.
Pescara La Verde Abruzzo Single Transport Company (it) (TUA) 11 September 2025 1 26 8.15 km (5.06 mi) eBRT trolleybuses Not BRT certified in 2025.
Taranto Linee della rete BRT - - - - - System under construction eBRT electric buses Not BRT certified in 2022.
Turin - Gruppo Torinese Trasporti - - - - Under construction eBRT electric buses Not BRT certified in 2025.
Genoa 4 Assi di Forza - - - - - (4 Assi di Forza - Superbus - project of 4 BHNS lines, scheduled to enter service between 2024 and 2026 eBRT trolleybuses Not BRT certified in 2022.

Netherlands

BRT systems in  Netherlands
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Almere AllGo (nl) (Maxx Almere) Connexxion 10 December 2017 10 19 58 km (36 mi) Started on 4 January 2004 and Close Maxx Almere (nl) on 9 December 2017 replace to AllGo Buses. Not BRT certified in 2022.
Eindhoven Phileas - 2003 3 32 15 km (9.3 mi) Bus rapid transit and guided busway, Phileas system in Eindhoven. Not BRT certified in 2014.
Amsterdam, Schiphol R-net (nl)(Zuidtangent) GVB 2002 2 33 56.7 km (35.2 mi) Zuidtangent rename to R-net Buses lines 300 and 397. Not BRT certified in 2014.
Enschede Bravodirect (nl) (HOV) Twents (public transport) (nl) July 2018 2 40 23 km (14 mi) High-quality public transport (nl) (HOV Buses) under Bravodirect. Not BRT certified in 2022.
Utrecht U-OV (nl) Qbuzz 2001 2 16 8.2 km (5.1 mi) Line 28 to the De Uithof university campus and Vleuten. Not BRT certified in 2014.

Norway

In the following table, BRT systems in light blue are under construction.

BRT systems in  Norway
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Trondheim Metrobus (no) Vy Buss, Tide ASA 3 August 2019 3 150 - The city's transport authority, claim AtB as owner of company Not BRT certified in 2022.
Stavanger/Sandnes Bussveien - - - - 50 km (31 mi) The bus rapid transit system planned to be the longest in Europe, 50 km, 80% dedicated right of way. (Under construction planned finished phase one: 2026.) Not BRT certified in 2025.

Poland

In the following table, BRT systems in light blue are under construction.

BRT systems in  Poland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Kraków - - - - - - There is a bus rapid transit system shared with trams, consisting of two sections, one at Monte Cassino Street and another one at Grzegórzki Street, Warsaw Uprisers' Avenue and in the north part of Old Town ring, as well as bus lanes on the Three Wisemen Avenues. Not BRT certified in 2024.

Portugal

In the following table, BRT systems in light blue are under construction.

BRT systems in  Portugal
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Coimbra Mondego Mobility System Metro Mondego, SA 29 August 2025 3 42 42 km (26 mi) Portugal's first Bus Rapid Transit system was announced in 2020 and is expected to launch by the end of 2025. With an extension of 42 km, 42 stations, 35 vehicles, and initially connecting 3 municipalities. To be completed by 2025, with the first phase operational by the end of 2024. Construction is currently under way. eBRT electric buses Not BRT certified in 2024.
Porto Metrobus line 1 Metro do Porto - 1 - 8 km (5.0 mi) A Bus Rapid Transit System will be built between Boa Vista and Praça do Império. It will be 8 kilometres long and is scheduled to be completed by the last quarter of 2023. It plans to have a fleet of 8 hydrogen powered articulated buses. Not BRT certified in 2024.
Braga Braga BRT - - - - - Under construction, to be completed by 2026. Not BRT certified in 2024.
Faro Algarve Metrobus - - 1 24 34 km (21.1 mi) A proposed 38 kilometre line that will that will connect the city of Faro with the neighboring municipalities of Olhão and Loulé. It will serve around 85,000 residents, costing €300-€510 million upon completion in 2029. (Under construction, to be completed by 2029) Not BRT certified in 2024.

Spain

In the following table, BRT systems in light blue are under construction.

BRT systems in  Spain
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Barcelona Barcelona Orthogonal Bus Network (es) Transports Metropolitans de Barcelona (TMB) 1 October 2012 28 - - eBRT electric buses Not BRT certified in 2022.
Castellón de la Plana TRAM Castellón Mediterranean Cars (AMSA) 25 June 2008 1 19 7.765 km (4.825 mi) eBRT trolleybuses Not BRT certified in 2022.
Granada Granada LAC Rober Transport (es) 29 June 2014 1 19 8.4 km (5.2 mi) Not BRT certified in 2022.
Las Palmas MetroGuagua (es) Municipal Buses (es) - 12 20 11.7 km (7.3 mi) System under construction expected for 2027. eBRT electric buses Not BRT certified in 2024.
Madrid Line BR1 (EMT Madrid) (es) EMT Madrid May 2023 8 - 31 km (19 mi) eBRT electric buses Not BRT certified in 2022.
Murcia Tranvibus de Murcie - - 3 - 20.84 km (12.95 mi) eBRT electric buses Not BRT certified in 2024.
Seville Tranvibus de Séville TUSSAM 2025 2 17 12.1 km (7.5 mi)
Pamplona Regional Urban Transport Trunk Network (es) Transports Ciutat Comtal (es) (TCC) - 4 - 24 km (15 mi)
Vitoria-Gasteiz TUVISA (Vitoria Urban Transport SA) (BEi) (es) TUVISA 1 January 1967 3 - - eBRT electric buses Not BRT certified in 2022.

Sweden

BRT systems in  Sweden
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Gothenburg Stombussar (sv) Västtrafik January 2003 4 24 17 km (11 mi) The lines (16-19) have frequent service. Routes usually share the right-of-way with trams or have a busway. Not BRT certified in 2022.
Stockholm Blåbussar (sv) (Blue buses) Storstockholms Lokaltrafik 1998 5 - 40 km (25 mi) The lines (1-4, 6) run frequently and have a higher priority than other buses. The buses are blue; other buses are red. Differences between blue and red buses are very slight however. Not BRT certified in 2022.
Malmö Malmö Expressen Line 5 (Huvudlinjer) Nobina Sverige and Skånetrafiken 1 June 2014 8 16 - The (main lines) (1-8), which run every seven or eight minutes on weekdays. eBRT electric buses Not BRT certified in 2022.
Jönköping Citybussarna (sv) Örebro County Transport (sv) 1996 3 440 39.2 km (24.4 mi) Line (1-3), which usually run about every 10 minutes. Not BRT certified in 2022.
Örebro Stombussar (sv) City buses in Västerås (sv) and Länstrafiken Örebro (sv) 1915 10 - - It serve two other urban lines. Not BRT certified in 2022.
Linköping Stomlinjer (sv) Östgötatrafiken (sv) - 6 - - Not BRT certified in 2022.

Switzerland

BRT systems in  Switzerland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Zurich Verkehrsbetriebe Zürich Zürcher Verkehrsverbund 2007 1 27 11 km (6.8 mi) Not BRT certified in 2022.

Turkey

United Kingdom

In the following table, BRT systems in light blue are under construction.

BRT systems in  United Kingdom
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Belfast Glider (EWAY) Translink September 2018 - - 24.5 km (15.2 mi) The bus rapid transit system operating on Service G1 serves east–west and service G2 serves Titanic Quarter. eBRT electric buses Not BRT certified in 2022.
Birmingham, West Midlands Sprint. Sprint Diamond West Midlands - 7 - - A limited stop service with dedicated bus lanes, with a total of 7 routes to be operational by 2026. (Under construction until 2026)
Bradford Manchester Road Quality Bus Initiative Bradford end First West Yorkshire October 2001 - - - 1.4 miles (2.3 km) of guided busway and a further 0.6 miles (1 km) of unguided bus lanes on Manchester Road to the city centre.
Bristol MetroBus First West of England 29 May 2018 5 - 50 km (31 mi) The bus rapid transit network which is a section of guided busway in Ashton Gate and a bus-only exit and bridge on the M32 motorway
Cambridgeshire Cambridgeshire Guided Busway Stagecoach East & Whippet 7 August 2011 3 8 25 km (16 mi) The guided busway runs north-west from Milton Road to St Ives and south from the station to the Trumpington park and ride. Bronze BRT certified (2013).
Colchester Colchester BRT First Essex 2025 1 8 8 km (5.0 mi) Not BRT certified in 2025.
Crawley Fastway BRT Metrobus October 2006 3 150 24 km (15 mi) Segregated lanes and 1 mile (1.5 km) of guided busway. route 10 connects Bewbush to Gatwick Airport, Route 20 links Broadfield to Horley, and Route 100 runs between Maidenbower and Redhill, all with stops in Crawley and Gatwick Airport Not BRT certified in 2022.
Hampshire South East Hampshire BRT (Eclipse) First Hampshire & Dorset 22 April 2012 2 7 3.4 km (2.1 mi) Between Gosport and Fareham. A 2.8-mile (4.5 km) bus-only road along the former Fareham–Gosport line has been opened from Titchborne Way in Gosport to Redlands Lane in Fareham as phase one of a larger scheme. Operated by First Hampshire & Dorset as Eclipse.
Ipswich Ipswich Rapid Transit
(Superroute 66)
First Bus East of England 1995 - - - It is a 219 yards (200 m) guided busway section.
Kent & Essex Fastrack Go-Ahead London & Stagecoach South East 26 March 2006 7 - - Unguided with sections of segregated running using standard buses and was re-opened on 17 November 2024 eBRT electric buses
Leeds Leeds Superbus First West Yorkshire July 1998 - - - Guided busway along York Road (the A64)
Liverpool - Metro (Merseytravel; Operator TBC) - - - - New rapid 'Glider' bus that will provide connections to Liverpool John Lennon Airport and the city's football stadiums by 2028. The 18-metre, articulated vehicle can transport around 30% more passengers than an average double decker bus. Under construction eBRT electric buses
London East London Transit Blue Triangle & Go-Ahead London 20 February 2010 - - Bus rapid transit system with three routes.
Luton Luton to Dunstable Busway Arriva & Centrebus and Grant Palmer 24 September 2013 - - 13.4 km (8.3 mi) It runs between Luton Airport and Houghton Regis via Dunstable following the Dunstable branch line, which closed in 1989, running parallel to the A505 (Dunstable Road) and A5065 (Hatters Way).It runs for 6.1 miles, 4.8 mi are guided bus track with a maximum speed of 50 mph. The £91 million scheme.
Greater Manchester Leigh-Salford-Manchester Bus Rapid Transit Go North West, Bee Network 3 April 2016 2 35 22 km (14 mi) From Leigh and Atherton to Manchester via Tyldesley and Ellenbrook. The 29-stop scheme totals 14 miles (22 km) and uses part of a former railway line to form a 4 miles (7 km) guided busway with a pedestrian and cycle lane and bridleway. It then joins the East Lancashire Road in a dedicated bus lane.
Gateshead, Newcastle upon Tyne & Tyne and Wear Centrelink Go North East - - - - Was an infrastructure project including an exclusive busway for bendy bus services
Runcorn Runcorn Busway Arriva North West October 1971 - 38 22 km (14 mi) It was the first BRT system in the world and runs for 22 kilometres (14 mi) in a figure of 8 across the town.
Sheffield Bus Rapid Transit North First South Yorkshire 4 September 2016 3 - - -
Swansea FTR Metro First Cymru September 2009 1 27 13.5 km (8.4 mi) Partially segregated, specialised BRT vehicles, on-board payment to customer-care attendant, runs every 15 minutes from 7 am to 7 pm (a conventional bus at other times).

North America

Canada

In the following table, BRT systems in light blue are under construction.

BRT systems in  Canada
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Calgary MAX Calgary Transit 19 November 2018 4 63 56 km (35 mi) Calgary Transit, BRT System make up their network of rapid transit along with their light rail. Not BRT certified in 2022.
Brampton, Ontario Züm Brampton Transit 20 September 2010 5 - - Brampton Transit has a pay-on-board system, similar to its local Brampton Transit counterpart. Not BRT certified in 2014.
Durham Region, Ontario (suburban Toronto) DRT Pulse Durham Region Transit 29 June 2013 4 - -
Mississauga, Ontario Mississauga Transitway MiWay 17 November 2014 1 12 18 km (11 mi)
Toronto York University Busway Toronto Transit Commission (TTC) 20 November 2009 - - 1.8 km (1.1 mi) Toronto Transit Commission (TTC) formerly operated the BRT route, 196 York University Rocket on the York University Busway. Although it has been successful, the TTC planned to close the BRT route once the extension to Line 1 of the Toronto subway was completed. Following completion of the subway extension, the small portion near York University was closed and turned back to the university, whereas the just under 2 km section between Finch West station and Dufferin Street remains in operation. The busway is still used by a handful of routes. Elsewhere, dedicated bus lanes are starting to be installed on city roadways, starting with Eglinton Avenue East, Kingston Road and Morningside Avenue in 2020. Jane Street is being planned through 2021, with three additional corridors (Dufferin, Steeles West and Finch East) to be designed afterwards. A sixth corridor (Lawrence East) is in consideration. Not BRT certified in 2022.
Ottawa, Ontario Transitway OC Transpo 1983 12 57 59 km (37 mi) OC Transpo is one of North America's largest BRT systems, with over 200,000 passengers daily and peak capacities of 10,000 passengers per hour per direction. Most sections of the Transitway have a speed limit of 70–90 km/h (43–56 mph) between stations and 50 km/h (31 mph) in station areas. Many routes converge at the Transitway, providing frequent service. Bronze BRT certified (2013).
York Region, Ontario (suburban Toronto) Viva Rapid Transit York Region Transit 4 September 2005 4 27 31.9 km (19.8 mi) Viva Blue, began service in 2005. In response to escalating congestion on the region's roads, the region's transit plan included a provision for a BRT system along the Yonge Street and Highway 7 arterial corridors. Most of the system does not contain transit-priority measures, other than an honor system of fare payment. Bronze BRT certified (2016).
Kitchener, Waterloo Region, Ontario ION Grand River Transit (GRT) - 1 - - Grand River Transit has two routes fairway station, (iXpress) express bus service and one of which (Route 200) has been converted to the ION light rail and BRT service: Dedicated and separated lanes for high-frequency buses from Fairway Station to Downtown Cambridge. Not BRT certified in 2025.
London, Ontario Rapid Transit London Transit - 3 (including Downtown Loop) 23 15.8 km (9.8 mi) London Transit will make up their network of bus rapid transit once completed. The City of London, Ontario currently has Wellington Gateway and East London Link under construction as to otherwise the "Shift" corridors.
Halifax, Nova Scotia MetroLink Halifax Transit 21 August 2005 - - - Halifax Transit was a BRT system with three routes linking Portland Hills, Woodside and Sackville and downtown Halifax. Fares were higher than the conventional Metro Transit. Not BRT certified in 2014.
Gatineau, Quebec Rapibus Société de transport de l'Outaouais (STO) 2013 7 12 12 km (7.5 mi)
Montreal, Quebec Pie-IX BRT Société de transport de Montréal (STM) 7 November 2022 - 20 13 km (8.1 mi) Montreal bus rapid transit, The SRB (Service rapide par bus) Pie-IX is currently under construction on Pie-IX Boulevard, with dedicated right of way and station-like stops, including indoor transfer to a metro station also under construction. Other lines have preferential traffic signals and dedicated lanes. Not BRT certified in 2022.
Quebec City Metrobus (Quebec) (fr) RTC November 2019 4 189 120 km (75 mi) Réseau de transport de la Capitale, Métrobus has four BRT routes throughout the city: routes 800, 801, 802, 803, 804 and 807 Not BRT certified in 2022.
Saskatoon Link (Saskatoon) Saskatoon Transit - - - - Saskatoon Transit had four DART (Direct Access Rapid Transit) routes which connected downtown Saskatoon, Confederation Mall, The Centre, the University of Saskatchewan, Lawson Heights Mall, University Heights Suburban Centre and the Saskatchewan Polytechnical Institute campus. The service was expanded to a greater set of suburban connector routes, but rebranded into STS's regularly scheduled service. (e.g. 81, 82, 83, 84, and 86 serving outgoing routes, and are all consolidated as 8 when returning to the downtown terminal after serving their respective neighbourhoods.) Not BRT certified in 2025.
Vancouver, British Columbia RapidBus (TransLink) TransLink 6 January 2020 6 75 - TransLink started in 2020 as a successor to its B-Lines, with more passenger features and amenities. The 99 B-Line is the last remaining B-Line route and has been successful, but TransLink estimates that its SkyTrain costs about $0.75 per ride compared to $1.04-$2.22 for its BRT routes. Two B-Line routes have been replaced by rapid-transit lines; the 98 B-Line was replaced with the Canada Line in 2009 and the 97 B-Line by the Evergreen Extension in 2016. Another two B-Lines, the 95 and 96, were replaced with RapidBus routes, the R5 and R1 respectively. Along with the two upgraded B-Lines, there are also three other RapidBus routes, R2, the R3 and R4. A sixth route, the R6, is the most recent expansion, having opened in January 2024. Not BRT certified in 2022.
Kelowna, British Columbia 97X Kelowna RapidBus Kelowna Regional Transit System (part of RapidBus is BC Transit) September 2010 - - - Not BRT certified in 2014.
Victoria, British Columbia Blink RapidBus Victoria Regional Transit System 10 April 2023 - - - Victoria Regional Transit System service started in 2023, providing faster and more frequent service on an existing bus corridor using bus priority lanes. The service has its own branding with larger and differently colored bus shelters. Not BRT certified in 2024.
Winnipeg Winnipeg RT Winnipeg Transit April 2012 1 16 4 km (2.5 mi) Winnipeg Transit operates similarly to Ottawa's, with dedicated lanes outside the downtown core and HOV lanes within it. The first phase connects downtown with Fort Rouge, with current routes servicing the University of Manitoba along Pembina Highway and a few suburban communities in the south-west. It will be eventually extended to Bison Drive. Not BRT certified in 2014.

El Salvador

BRT systems in El Salvador
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
San Salvador Integrated Transport System of the Metropolitan (SITRAMSS) (es) SITRAMSS Business Union 23 December 2013 1 9 6 km (3.7 mi) Close in March 2020. Not BRT certified in 2014.

Guatemala

BRT systems in Guatemala
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Guatemala City Transmetro Municipalidad de la Ciudad de Guatemala (Municipality of Guatemala City) 3 February 2007 7 107 24 km (15 mi) Transmetro has 7 lines and 107 stations, and 1 line with 14 stations under construction. The first line (Line 12), opened on February 3, 2007, and crosses Aguilar Batres Avenue from Villa Nueva to the city's downtown. The second line (Line 13) began operation on August 12, 2010, and crosses 6th and 7th Avenue in a one-way-per-avenue scheme. Lines 1, 2, 6, 7, and 18 have been added recently, and Line 5 is under construction. The line number represents the main zone each line serves (For example, most of Line 7 runs through Zone 7's neighborhoods, Line 1 runs through Zone 1, and so on). Gold BRT certified (2014).
- - - 11.7 km (7.3 mi) Transmetro - Eje Central Silver BRT certified (2014).
Transurbano Sistema Integrado Guatemalteco de Autobuses (SIGA) 3 July 2010 41 400 - Not BRT certified in 2014.
TuBus (es) Municipality of Guatemala City 6 July 2023 4 - 12 km (7.5 mi) Not BRT certified in 2024.
Mixco Express Routes (es) Municipality of Mixco 25 February 2017 3 - - Not BRT certified in 2022.
Villa Nueva TransMIO (es) Municipality of Villa Nueva 20 December 2017 3 - 27 km (17 mi) Not BRT certified in 2022.
Santa Catarina Pinula TransPinula Municipalidad de Santa Catarina Pinula (Santa Catarina Pinula Municipality) 29 January 2022 2 22 - Not BRT certified in 2022.

Martinique

BRT systems in Martinique
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Fort-de-France TCSP (fr) RTM (Martinique Transport Authority) 13 August 2018 2 18 13.9 km (8.6 mi) Martinique bi articulated bus rapid transit. Not BRT certified in 2022.

Mexico

In the following table, BRT systems in light blue are under construction.

BRT systems in  Mexico
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Mexico City Trolleybuses in Mexico City Servicio de Transportes Eléctricos (STE) 9 March 1951 11 303 203.64 km (126.54 mi) eBRT trolleybuses Not BRT certified in 2015.
Mexico City Metrobús Sistema de Corredores de Transporte Público de Pasajeros del Distrito Federal 19 June 2005 7 283 174.6 km (108.5 mi) The first line runs in dedicated lanes along Avenida Insurgentes, and there are seven lines (including one along Paseo de la Reforma). 4 Silver + 1 Bronze BRT corridors certified (2013) & (2014).
Metrobus - Line 1 19 June 2005 1 46 27.4 km (17.0 mi) Silver BRT certified (2013).
Metrobus - Line 2 16 December 2008 1 37 17 km (11 mi)
Metrobus - Line 3 8 February 2011 1 38 20 km (12 mi)
Metrobus - Line 4 1 April 2012 1 43 28 km (17 mi) Bronze BRT certified (2013).
Metrobus - L5 Río de los Remedios - San Lazaro 5 November 2013 1 51 10 km (6.2 mi) Silver BRT certified (2014).
State of Mexico Mexibús Transmasivo S.A. 2 October 2010 4 161 121.6 km (75.6 mi) It is operated by Transmasivo (Lines I and IV) and Transcomunicador (Line II) and Transporte de Oriente (Line III)[citation needed] Silver BRT certified (2014).
Mexibús Line I Transmasivo (Lines I and IV) 1 December 2010 1 34 20 km (12 mi)
Mexibús Line II Transcomunicador (Line II) 12 January 2015 1 52 56.3 km (35.0 mi) Not BRT certified in 2015.
Mexibús Line III Red de Transporte de Oriente (Line III) 30 April 2013 1 45 23 km (14 mi) Not BRT certified in 2013.
Mexibús Line IV Transmasivo (Lines I and IV) 24 February 2021 1 30 22.3 km (13.9 mi) Not BRT certified in 2022.
León, Guanajuato SIT Optibús Transportistas Coordinados de León 28 September 2003 10 65 65.1 km (40.5 mi) Not BRT certified in 2015.
Villahermosa Transbus Systems - Transmetropolitano(es) Integrated Urban Transport SA de CV, Integrated Urban Transport of Villahermosa SC de RL de CV, Metropolitan Transport Pomoca SA de CV, Beach and Grill Transport SC de RL de CV 1 August 2008 1 100 47.4 km (29.5 mi) Not BRT certified in 2015.
Guadalajara Guadalajara Mi Macro Mi Macro Calzada (Alianza de Camioneros de Jalisco, Peribús Metropolitano) 10 March 2009 2 27 16 km (9.9 mi) Gold BRT certified (2013).
Mi Macro Periférico (Alianza de Camioneros de Jalisco, Peribús Metropolitano) 31 January 2022 2 42 41.5 km (25.8 mi) Silver BRT certified (2024).
San Andrés Cholula, Puebla Urban Articulated Transport Network (RUTA)(es) Puebla Toll Roads (CCP) 16 January 2013 3 104 47.6 km (29.6 mi) Bronze BRT certified (2014).
Chihuahua City Bowí (ViveBús)(es) ViveBús Chihuahua Transport Operator, SA de CV 24 August 2013 1 42 20.4 km (12.7 mi) Not BRT certified in 2015.
Ciudad Juárez BravoBús(es) Juárez Transportation Integrator 30 November 2013 4 99 65 km (40 mi) Not BRT certified in 2015.
Monterrey TransMetro(es) Senda Group, Lazcano Group, TUS Group, Tuesa, Transcountry, Coremty, Sati Group, Trees Group 28 November 2002 2 - 10.7 km (6.6 mi) Not BRT certified in 2015.
Ecovía Monterrey metropolitan area 28 January 2014 1 40 30.1 km (18.7 mi) Silver BRT certified (2014).
Pachuca Tuzobús(es) Vanguard and Change Company SA de CV 16 August 2015 1 31 16.5 km (10.3 mi) Not BRT certified in 2022.
Acapulco Acabus(es) Sistema Integral de Transporte (SIT) 25 June 2016 17 26 36.2 km (22.5 mi) Not BRT certified in 2022.
Tijuana Sistema Integral de Transporte de Tijuana (SITT)(es) SITT SA de CV 28 November 2016 2 47 22.9 km (14.2 mi) The SITT BRT system operates a route from downtown Tijuana and Garita Puerto Mexico near the San Ysidro Port of Entry, southeast along the Tijuana River to Terminal Insurgentes in the southeastern part of the city. Not BRT certified in 2022.
Querétaro Qrobús - 29 October 2017 2 20 32 km (20 mi) Not BRT certified in 2022.
Mérida, Yucatán Ie-Tram Yucatán Mobility ADO (es) 15 December 2023 5 67 116 km (72 mi) eBRT electric buses Bronze BRT certified (2024).
Oaxaca City Citybús(es) Proyecto de Apoyo a la Movilidad Urbana y Renovación de Parque Vehicular en la Ciudad de Oaxaca - 1 27 8.5 km (5.3 mi) Not BRT certified in 2024.
Torreón Metrobús Laguna - - - - - Under construction
Tampico Metrobús Tampico - - - - - Under construction
San Luis Potosí - - - - - - Under construction

Panama

BRT systems in Panama
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Panama City MiBus - 28 December 2010 10 15 5 km (3.1 mi) Not BRT certified in 2012.

Puerto Rico

BRT systems in Puerto Rico
City System name Operador Began Lines Stations Length Notes/Description Type BRT certified
San Juan Urban Metro(es) First Transit 26 October 2012 1 - 16.5 km (10.3 mi) Not BRT certified in 2014.

Trinidad and Tobago

BRT systems in Trinidad and Tobago
City System name Operador Began Lines Stations Length Notes/Description Type BRT certified
Port of Spain, Arima Public Transport Service Corporation Priority Bus Route 1 May 1965 1 - 24.9 km (15.5 mi) East–West Corridor Not BRT certified in 2014.

United States

In the following table, BRT systems in light blue are under construction.

BRT systems in  United States
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Atlanta MARTA Rapid Summerhill BRT Metropolitan Atlanta Rapid Transit Authority - - - 8 km (5.0 mi) Under construction

MARTA's first bus rapid transit (BRT) line is currently under construction. The construction is scheduled to be completed in 2025 with revenue service beginning in late 2025. The 5-mile (8-kilometer) line will run from downtown Atlanta, through Summerhill, and end at the Atlanta Beltline. The line, named the "MARTA Rapid Summerhill", will utilize new 60-foot (18-meter) articulated electric buses.

Not BRT certified in 2024.
Albany - Schenectady, New York BusPlus BRT Capital District Transportation Authority 4 April 2011 - - - Not BRT certified in 2022.
Albuquerque, New Mexico Albuquerque Rapid Transit (ART) Rapid Ride 30 November 2019 2 19 22.2 km (13.8 mi) First Gold-Standard BRT line in the United States
Allentown, Pennsylvania Enhanced Bus Service Lehigh and Northampton Transportation Authority (LANTA) - - - - Blue Line and Green Line under construction Not BRT certified in 2024.
Pitkin and Garfield Counties, Colorado VelociRFTA BRT Roaring Fork Transportation Authority 3 September 2013 1 18 71.5 km (44.4 mi) Not BRT certified in 2014.
Austin, Texas CapMetro Rapid CapMetro 26 January 2014 4 50 -
Birmingham, Alabama Birmingham Xpress Birmingham-Jefferson County Transit Authority 22 September 2022 - 18 16 km (9.9 mi) Not BRT certified in 2022.
Boston Silver Line Massachusetts Bay Transportation Authority (MBTA) 17 December 2004 6 20 - Not BRT certified in 2013.
Columbus Avenue Bus Lanes
Charleston, South Carolina Lowcountry Rapid Transit - - - - - Planned, estimated to start in 2026. Not BRT certified in 2024.
Chicago Pace I-90 Express Bus Pace (transit), Milwaukee and Dempster lines - 4 25 43.4 km (27.0 mi) Not BRT certified in 2022.
Pace Pulse 11 August 2019 2 17 -
Cleveland HealthLine Greater Cleveland RTA 24 October 2008 1 59 11 km (6.8 mi) Silver BRT certified (2013).
Denver, Colorado LYNX Regional Transportation District (RTD) 2027 (Planned) 1 (Under Construction) 30 17.7 km (11.0 mi) Not BRT certified in 2025
Columbus, Ohio CMAX Central Ohio Transit Authority (COTA) 1 January 2018 - - 25.1 km (15.6 mi) Not BRT certified in 2022.
El Paso, Texas Sun Metro Brio Sun Metro 27 October 2014 - 98 86.6 km (53.8 mi) Not BRT certified in 2014.
Escondido, California Breeze Rapid North County Transit District 7 June 2011 1 25 -
Eugene, Oregon Emerald Express (EmX) Lane Transit District (Green Line) 14 January 2007 3 37 21 km (13 mi) The Emerald Express (EmX) BRT in Eugene, Oregon, uses magnetic guidance on an especially curvy section of about 3 miles (1.5 miles each way) of the route. Bronze BRT certified (2013).
Fort Collins, Colorado MAX Bus Rapid Transit Transfort 10 May 2014 - 14 15 km (9.3 mi) Not BRT certified in 2014.
Grand Rapids, Michigan Silver Line The Rapid 25 August 2014 1 34 15 km (9.3 mi)
Laker Line 24 August 2020 1 13 21.4 km (13.3 mi) Not BRT certified in 2022.
Hartford, Connecticut CT Fastrak CT Transit 28 March 2015 4 10 15.1 km (9.4 mi) (New Britain-Hartford Busway) Silver BRT certified (2016).
Houston METRO Quickline Metropolitan Transit Authority of Harris County 1 June 2009 2 8 14.5 km (9.0 mi) HOV system Planned to be followed by METRORapid in August 2020 Not BRT certified in 2013.
METRORapid University Line 2029 - 39 40 km (25 mi) Not BRT certified in 2025.
METRORapid Silver Line 23 August 2020 1 10 7.6 km (4.7 mi) Not BRT certified in 2022.
Indianapolis Red Line Indianapolis Public Transportation Corporation, (IndyGo) 1 September 2019 - 28 21.1 km (13.1 mi)
Purple Line 13 October 2024 - 31 24.5 km (15.2 mi) Not BRT certified in 2024.
Blue Line ( under construction) - - - 39 km (24 mi) The Blue Line took place on 28 February 2025 and is anticipated to open in 2028
Jacksonville, Florida First Coast Flyer Jacksonville Transportation Authority 7 December 2015 4 50 93 km (58 mi) Not BRT certified in 2022.
Kansas City, Missouri Metro Area Express Kansas City Area Transportation Authority 24 July 2005 3 87 51 km (32 mi) Not BRT certified in 2013.
Lake County, Indiana Broadway Metro Express Gary Public Transportation Corporation 19 February 2018 - 24 - Not BRT certified in 2022.
Las Vegas ACE BRT RTC Transit - - - 2 km (1.2 mi) RTC of Washoe County, Reno, Nevada The first ACE line was named ACE Downtown Connector and would travel from the World Market Center, Downtown Las Vegas, Las Vegas Convention Center, Las Vegas Strip, before finally terminating at McCarran Airport. Strip & Downtown Express (SDX) The MAX Line Las Vegas Blvd North, began 30 June 2004 and Ended service 20 February 2016. BRT certified (2013).
Los Angeles Los Angeles Metro Busway Los Angeles County Metropolitan Transportation Authority (LACMTA) 29 October 2005 2 29 89.6 km (55.7 mi) Not BRT certified in 2013.
G Line Line number 901 17 28.5 km (17.7 mi) Bronze BRT certified (2013).
Harbor Transitway 26 June 1996 - - 16.6 km (10.3 mi) Harbor Gateway Transit Center Not BRT certified in 2013.
J Line 13 December 2009 Line number 910 & 950 12 61 km (38 mi)
North Hollywood to Pasadena Bus Rapid Transit Project 2027 - - - Not BRT certified in 2025.
Louisville, Kentucky Dixie Rapid Transit Authority of River City (TARC) 6 January 2020 1 18 24 km (15 mi) Not BRT certified in 2022.
Madison, Wisconsin Rapid Route A Metro Transit (Madison) 22 September 2024 3 32 - Metro Rapid Route A is a bus rapid transit service on an East-West alignment. eBRT electric buses Not BRT certified in 2024.
Miami-Dade County, Florida South Dade TransitWay Miami-Dade Transit 3 February 1997 1 28 10.5 km (6.5 mi) Not BRT certified in 2013.
Milwaukee Connect 1 BRT Milwaukee County Transit System (MCTS) 4 June 2023 - - 14 km (8.7 mi) Not BRT certified in 2024.
Connect 2
(planned, but on hold until further notice)
- - - - Not BRT certified in 2024.
Minneapolis–Saint Paul Metro Red Line Metro Transit 22 June 2013 1 5 16.3 km (10.1 mi) Not BRT certified in 2013.
Metro Orange Line 4 December 2021 1 12 27 km (17 mi) Not BRT certified in 2022.
Metro A Line 11 June 2016 1 20 15.9 km (9.9 mi)
Metro C Line 8 June 2019 1 20 13.5 km (8.4 mi)
U of M Transitway University of Minnesota Campus Shuttle 1992 1 2 4.2 km (2.6 mi) Not BRT certified in 2013.
Newark, New Jersey Go Bus NJ Transit 25 September 2008 2 - -
New York City Select Bus Service MTA Regional Bus Operations 2008 17 26 102 km (63 mi)
New Orleans RTA's BRT New Orleans Regional Transit Authority (NORTA) - - - - Not BRT certified in 2024.
Oakland, California Tempo BRT AC Transit 9 August 2020 3 34 15.3 km (9.5 mi) Not BRT certified in 2022.
Omaha, Nebraska ORBT Metro Transit 18 November 2020 1 23 13.2 km (8.2 mi)
Orlando, Florida LYMMO (BRT) Central Florida Regional Transportation Authority (Lynx) 1997 1 22 5.1 km (3.2 mi) Not BRT certified in 2013.
Philadelphia Boulevard Direct BRT SEPTA 22 October 2017 1 - - Not BRT certified in 2022.
Phoenix, Arizona Phoenix BRT (planned) - - - - Not BRT certified in 2024.
Pittsburgh Martin Luther King Jr. East Busway Pittsburgh Regional Transit February 1983 1 10 14.6 km (9.1 mi) Bronze BRT certified (2013).
West Busway September 2000 1 6 8.2 km (5.1 mi) BRT certified (2013).
South Busway December 1977 1 12 6.9 km (4.3 mi) BRT certified (2013).
Providence, Rhode Island East Side Transit Tunnel - 1948 1 - - First BRT System in Providence, Rhode Island Not BRT certified in 2013.
Portland, Oregon Frequent Express TriMet 18 September 2022 1 47 24 km (15 mi) A BRT completed between downtown Portland and downtown Gresham mainly following Southeast Division Street. Not BRT certified in 2024.
Provo - Orem, Utah Utah Valley Express Utah Transit Authority (UTA) 13 August 2018 1 17 17.7 km (11.0 mi)
Ogden, Utah Ogden Express 29 August 2022 1 13 8.5 km (5.3 mi)
Midvalley Express - 1 15 11 km (6.8 mi) Not BRT certified in 2024.
Salt Lake City 3500 South MAX 14 July 2008 1 26 17.4 km (10.8 mi) Service Closed on 7 August 2022. Not BRT certified in 2013.
Raleigh, North Carolina GoRaleigh BRT Raleigh Transit Authority - - - - Not BRT certified in 2024.
Rochester, Minnesota Link BRT Rochester Public Transit - - - - Link BRT Construction is expected to begin in fall 2024, with operations commencing 2026.
Richmond, Virginia GRTC Pulse Greater Richmond Transit Company 24 June 2018 1 14 11 km (6.8 mi) Bronze BRT certified (2016 & 2024).
San Bernardino, California sbX, (Green Line) Omnitrans 28 April 2014 2 - 25 km (16 mi) (operated by Omnitrans), sbX Green Line, a 16-mile route from Verdemont to Loma Linda. Bronze BRT certified (2014).
San Gabriel Valley El Monte Busway Foothill Transit January 1973 - 4 19 km (12 mi) Not BRT certified in 2014.
Santa Monica, California Rapid 3 Big Blue Bus 24 June 2000 3 - -
San Antonio VIA Primo Route 100 BRT VIA Metropolitan Transit 17 December 2012 3 11 19 km (12 mi) Fredericksburg Road corridor BRT, connecting downtown with the South Texas Medical Center
San Diego SuperLoop San Diego MTS 15 June 2009 3 17 4.48 km (2.78 mi)
Rapid (San Diego) 2002 10 39 -
San Francisco Van Ness BRT San Francisco Municipal Transportation Agency, Muni 1 April 2022 1 9 3.15 km (1.96 mi) Silver BRT certified (2024).
Geary BRT February 2021 4 26 - Not BRT certified in 2024.
San Francisco Bay Area, California
(Santa Clara Country)
VTA Rapid Route 522 Santa Clara Valley Transportation Authority 5 July 2005 2 - - Rapid Route 522 from Eastridge Transit Center in San Jose to Palo Alto Not BRT certified in 2013.
San Francisco Bay Area, California
(Alameda County)
Tri-Valley Rapid Livermore-Amador Valley Transportation Authority - - - -
Seattle RapidRide G Line King County Metro 14 September 2024 1 21 3.4 km (2.1 mi) Metro Bus Tunnel shares with light rail different routes metro bus RapidRide Not BRT certified in 2024.
SODO Busway 8 December 1991 1 - 2.4 km (1.5 mi) Not BRT certified in 2013.
Seattle metropolitan area
(Everett, Washington)
Swift BRT Community Transit 29 November 2009 3 78 65.2 km (40.5 mi)
Seattle metropolitan area
(Kirkland, Washington)
Stride BRT Sound Transit 2028 (S1 Line and S3 Line) to 2029 (S2 Line) 3 25 74 km (46 mi) Three lines connecting to S1: Burien to Bellevue, S2: Bellevue to Lynnwood, S3: Shoreline to Bothell. eBRT electric buses Not BRT certified in 2025.
Spokane, Washington City Line Spokane Transit Authority 15 July 2023 1 25 10 km (6.2 mi) eBRT electric buses Not BRT certified in 2024.
Stockton, California BRT Express San Joaquin RTD - - - - Not BRT certified in 2013.
St. Louis Green Line (St. Louis MetroLink) Metro Transit (St. Louis) - 1 10 9.3 km (5.8 mi) It was to expect to have light rail due to the financial cost but considers to have bus rapid transit, green line corridor. Not BRT certified in 2025.
St. Petersburg, Florida SunRunner BRT Pinellas Suncoast Transit Authority (PSTA) October 2022 - - - Not BRT certified in 2024.
Tulsa, Oklahoma Aero BRT Tulsa Transit - - - - Not BRT certified in 2013.
Washington, DC Metropolitan Area Metroway Alexandria, Washington Metropolitan Area Transit Authority (WMATA) 24 August 2014 1 17 11 km (6.8 mi) Not BRT certified in 2022.
Flash BRT Montgomery County, Maryland, Ride On 14 October 2020 2 12 23 km (14 mi)
Vancouver, Washington The Vine C-Tran (Washington) 8 January 2017 2 71 26 km (16 mi)
Virginia Beach, Virginia VB Wave Hampton Roads Transit - - - - VB Wave (some BRT features) Not BRT certified in 2013.

Oceania

Australia

BRT systems in Australia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Adelaide O-Bahn Busway Torrens Transit 9 March 1986 - 3 12 km (7.5 mi) One of the world's longest, fastest and most heavily used guided busways. Not BRT certified in 2013.
Brisbane South East Busway Transport for Brisbane, Clarks Logan City Bus Service, Mt Gravatt Bus Service, Transdev Queensland, Park Ridge Transit 13 September 2000 1 13 13.2 km (8.2 mi) Routes are linked through an underground hub in the central business district.
Busways in Brisbane carried over 70 million passengers in 2011.
Silver BRT certified (2013).
Northern Busway Transport for Brisbane 23 February 2004 1 13 -
Eastern Busway Transport for Brisbane 3 August 2009 1 6 -
Brisbane Metro Transport for Brisbane 28 January 2025 2 18 21 km (13 mi) eBRT electric buses Not BRT certified in 2022.
Melbourne SmartBus CDC Melbourne, Kinetic Melbourne, Ventura Bus Lines 1990 9 - - Has elements of BRT infrastructure but uses relatively few dedicated bus lanes.
Sydney B-Line Keolis Downer Northern Beaches 26 November 2017 - 10 31 km (19 mi)
Liverpool–Parramatta T-way Transit Systems NSW 2 February 2003 - 35 31 km (19 mi)
Metrobus Hillsbus, State Transit Authority, Transdev NSW, Transit Systems NSW, U-Go Mobility 12 October 2008 13 - - M2 bus corridor.
North-West T-way Busways, Hillsbus 10 March 2007 - 30 24 km (15 mi)

New Caledonia

BRT systems in New Caledonia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Nouméa Noumea Neobus (fr) CarSud (New Caledonia) (fr) 12 October 2019 1 23 13.3 km (8.3 mi) eBRT electric buses Not BRT certified in 2022.

New Zealand

In the following table, BRT systems in light blue are under construction.

BRT systems in New Zealand
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Auckland Northern Busway Ritchies Transport, Tranzit Group, (Tranzurban Auckland) February 2008 - 6 - Not BRT certified in 2013.
Central Connector - - - - - Under construction
Eastern Busway Kinetic Group, Go Bus, Howick & Eastern Buses - - - - Under construction

South America

Argentina

BRT systems in  Argentina
City System name Lines Began Stations Length Notes/Description Type BRT certified
Buenos Aires Metrobús Juan B. Justo 31 May 2011 21 12.5 km (7.8 mi) Bronze BRT certified (2013).
9 de Julio 24 July 2013 17 3.5 km (2.2 mi) Silver BRT certified (2014).
Sur 14 August 2013 37 23 km (14 mi) Not BRT certified in 2014.
25 de Mayo 5 October 2015 0 7.5 km (4.7 mi) Not BRT certified in 2022.
San Martín 27 April 2016 12 5.8 km (3.6 mi)
Norte Etapa 2 24 November 2016 21 2.8 km (1.7 mi)
del Bajo 6 June 2017 25 2.9 km (1.8 mi)
Norte 17 June 2015 39 2.7 km (1.7 mi)
Vicente López Partido 2.2 km (1.4 mi)
Quilmes Calchaquí Metrobus (es) 10 4 June 2019 12 8.7 km (5.4 mi)
La Matanza Partido La Matanza Metrobus (es) 1 5 May 2017 17 16 km (9.9 mi)
Neuquén Neuquen Metrobus 9 February 2019 13 6 km (3.7 mi)
Rosario Rosario Metrobus Norte 30 June 2016 6 1.8 km (1.1 mi)
Santa Fe Metrobus (Santa Fe) (es) 1 3 May 2017 15 5.7 km (3.5 mi)
Tres de Febrero Partido Tres de Febrero Metrobus 1 6 October 2017 7 3.3 km (2.1 mi)
Posadas Greater Posadas Metropolitan Integrated Transport System (es) 1 1 April 2007 - - Not BRT certified in 2014.
Córdoba Solo Bus Av. Sabattini 1 2014 9 5 km (3.1 mi)

Bolivia

BRT systems in Bolivia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
La Paz La Paz (es) Municipal Transportation System (SETRAM) 24 February 2014 8 174 - Not BRT certified in 2022.
El Alto Wayna Bus (es) (Sariri BRT) Integrated Municipal Transportation Service 3 March 2015 1 60 - Sariri BRT
Santa Cruz de la Sierra Santa Cruz de la Sierra Bus Rapid Transit System (es) - 13 May 2019 1 120 -

Brazil

In the following table, BRT systems in light blue are under construction.

BRT systems in  Brazil
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Criciúma Av. Centenírio Criciumense Urban Transport Association (ACTU) 1996 3 16 8 km (5.0 mi) Not BRT certified in 2013.
Curitiba Rede Integrada de Transporte Integrated Transport Network (RIT) 1974 6 21 81.4 km (50.6 mi) 6 Silver + 1 Gold BRT corridors certified (2013).
Boqueirao - - - 10.3 km (6.4 mi)
South Circular - - - 14.5 km (9.0 mi)
East line - - - 12.4 km (7.7 mi)
Green Line - - - 7.0 km (4.3 mi)
North line - - - 8.9 km (5.5 mi)
West line - - - 10.4 km (6.5 mi)
South line - - - 10.6 km (6.6 mi)
São Paulo São Mateus–Jabaquara Metropolitan Corridor ABD Metropolitan Corridor, ABD Headband and (Next Mobilidade) 3 December 1988 13 111 33 km (21 mi) eBRT trolleybuses Bronze BRT corridors certified (2013).
Expresso Tiradentes Expresso Tiradentes (Southeast Axis) and (SPTrans) 8 March 2007 2 10 8.2 km (5.1 mi) Silver BRT corridors certified (2013).
Diadema–Morumbi Metropolitan Corridor ABD Metropolitan Corridor, ABD Morumbi Extension (Metra) 30 July 2010 1 28 12 km (7.5 mi) Basic BRT corridors certified (2014).
Guarulhos–São Paulo Metropolitan Corridor Empresa Metropolitana de Transportes Urbanos de São Paulo (EMTU) and (Metra) 3 July 2013 12 22 12.3 km (7.6 mi) Not BRT certified in 2015.
Itapevi–Butantã Metropolitan Corridor March 2018 - 42 23.6 km (14.7 mi) Not BRT certified in 2022.
Corredor Metropolitano Noroeste 2010 1 30 32.7 km (20.3 mi) Not BRT certified in 2013.
BRT ABC Next Mobilidade 2023 3 19 17.3 km (10.7 mi) eBRT electric buses Not BRT certified in 2024.
São José dos Campos Linha Verde - 2022 1 13 22 km (14 mi) eBRT electric buses Not BRT certified in 2022.
Sorocaba BRT Sorocaba Urbes 30 August 2020 2 12 12.2 km (7.6 mi)
Rio de Janeiro TransOeste Rio de Janeiro BRT (MOBI-Rio) (pt) 6 June 2012 1 66 56 km (35 mi) 2 Gold +2 Silver BRT corridors certified (2013).
TransCarioca 1 June 2014 1 46 39 km (24 mi) 2 Gold +2 Silver BRT corridors certified (2014).
TransOlímpica 9 July 2016 1 21 26 km (16 mi) 2 Silver +2 Gold BRT corridors certified (2016).
TransBrasil 24 February 2024 1 19 26 km (16 mi) 2 Silver +2 Gold BRT corridors certified (2024).
Goiânia Anhanguera Axis (pt) Governo do Estado de Goiás (Metrobus) 1976 6 19 13.5 km (8.4 mi) Bronze BRT certified (2014).
Porto Alegre Companhia Carris Porto-Alegrense Empresa Pública de Transporte e Circulação (EPTC) 8 March 2014 11 9 55 km (34 mi) Basic + Bronze BRT corridors certified (2016).
Belo Horizonte BRT Move (pt) SETRA (municipal),

SINTRAM (metropolitan)

8 March 2014 29 56 23.1 km (14.4 mi) 1 Silver + 1 Gold BRT corridor certified (2014).
Linha - Antonio Carlos May 2014 1 24 16 km (9.9 mi)
Linha - Cristiano Machado 8 March 2014 1 9 7.1 km (4.4 mi)
Salvador, Bahia BRT Salvador (pt) Salvador Municipal Public Passenger Bus Transportation Service (STCO) 1 October 2022 4 14 6 km (3.7 mi) eBRT electric buses Not BRT certified in 2022.
Campinas BRT of Campinas (pt) - 25 November 2022 7 17 36.6 km (22.7 mi) Under construction from 2017 to 2020, it will have two main parallel lines Campo Grande and Ouro Verde and a secondary link Perimetral
Feira de Santana BRT Feira Sistema (SMTT) Getúlio Vargas e João Durval 2020 2 16 20.5 km (12.7 mi)
Florianópolis Integrated Mobility System (SIM) (pt) Phoenix Consortium, COTISA, Florianópolis City Hall - - - 17 km (11 mi) Under construction
Uberlândia Integrated Transport System (SIT) (pt) Southeast Structural Corridor (Av. João Naves de Ávila) 8 September 1996 174 16 7.5 km (4.7 mi) Silver BRT certified (2014).
Belém BRT Belem (pt) Belém River, Nova Marambaia, Guamá River, Via Loc 2019 4 33 20 km (12 mi) Not BRT certified in 2019.
Uberaba BRT Vetor Vetor East-West 31 January 2015 2 10 5.1 km (3.2 mi) Silver BRT certified (2016).
Juiz de Fora Av. Barão do Rio Branco - 1982 1 8 3.1 km (1.9 mi) Not BRT certified in 2013.
Londrina CMTU Londrina 3 linha, Rua João Cândido and Rua Duque de Caxias and Winston Churchill. Companhia Municipal De Trânsito E Urbanização De Londrina (CMTU) 2010 3 29 6.8 km (4.2 mi) Not BRT certified in 2013.
Fortaleza Fortaleza Express (pt) ETUFOR (Fortaleza Urban Transport Company)

Socicam

18 April 2015 2 15 17.4 km (10.8 mi) Not BRT certified in 2015.
Brasília BRT Express DF (pt) Expresso DF Sul 2 April 2014 4 20 25.9 km (16.1 mi) Bronze BRT certified (2014).
Recife BRT Freeway of Recife (pt) - 2014 2 44 49.9 km (31.0 mi) Basic + Bronze BRT corridors certified (2016).
Via Livre East/West 18 8.2 km (5.1 mi)
Via Livre North/South 26 22.8 km (14.2 mi)
Teresina Inthegra (pt) SITT(Teresina Transport System)

STRANS SETUT

2 July 2016 7 40 24 km (15 mi) Not BRT certified in 2022.
Maringá Mega BRT Morangueira - Kakogawa, Transporte Coletivo Cidade Canção (TCCC) 2018 13 11 3.8 km (2.4 mi)
Manaus Expresso (pt) Bus Leader, Bus Company São Pedro, Express Coroado, Eucatur Group, Global GNZ, Via Verde,Vega 14 December 2002 3 4 20 km (12 mi) Not BRT certified in 2013.
Natal, Rio Grande do Norte Av. Bernardo Vieira Sistema Integrado de Transportes 2008 1 8 3.5 km (2.2 mi)
Niterói Corredor Metropolitano Alameda São Boaventura 2 linha Niterói 2010 1 6 8 km (5.0 mi)
TransOceânica 2019 1 13 9 km (5.6 mi) BRT certified (2024).

Chile

In the following table, BRT systems in light blue are under construction.

BRT systems in  Chile
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Santiago Red Metropolitana de Movilidad STP Santiago S.A., Metro S.A., Tren Central 2007 5 29 90 km (56 mi) Transantiago transit system is integrated between the electric Biotren and BioBus, based on dedicated bus rights-of-way. eBRT electric buses Bronze BRT certified (2014).
Greece Avenue - 10 km (6.2 mi)
Avenidas Las Industrias - Seirra Bella/Carmen - 9.2 km (5.7 mi)
Pedro Aguirre Cerda - Exhibition/Bascunan Guerrero - 11.5 km (7.1 mi)
Santa Rosa North - 7.2 km (4.5 mi)
Santa Rosa South - 8.5 km (5.3 mi)
Concepción SEREMITT Biobus (es) Intermodal Transport Service SA 26 May 2006 3 46 15.2 km (9.4 mi) Not BRT certified in 2014.
Red Mobility Conception Network (es) EFE Sur (es) 2026 2 - 50 km (31 mi) Red Concepción de Movilidadses eBRT electric buses

Colombia

BRT systems in  Colombia
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Bogotá TransMilenio Consorcio Express, Gmovil, BMO Sur, Connexion Móvil, Somos K, SI18, Somos Bogotá Usme 4 December 2000 12 143 114.4 km (71.1 mi) Bogotá's segregated, four-lane TransMilenio system has a maximum peak-load capacity of 45,000 passengers per hour per direction (pphpd) on its busiest line. The system uses modular median stations that serve both directions and enable prepaid, multiple-door, level boarding. The average stop time is 24 seconds. Trunk-line terminals have integrated bicycle parking; the fare card opens a gate to a secure bicycle parking area. Two lanes in each direction permit "Quickways" (local service on the inside lane combined with express service, skipping four or five stations at a time). TransMilenio was described as a "model BRT system" in the National Bus Rapid Transit Institute's May 2006 report. It serves Bogotá with high-capacity, articulated, three-door buses. Bi-articulated buses are used on the busiest routes, and a smart card system is used for fare collection. Despite its large capacity, Transmilenio had problems with overcrowding. 2 Silver + 5 Gold BRT corridors certified (2013).
TransMilenio - Autonorte 2 February 2002 1 - 11.6 km (7.2 mi) Silver BRT certified (2013).
TransMilenio - Suba 29 April 2006 1 - 9.6 km (6.0 mi) Gold BRT certified (2013).
TransMilenio - Caracas - - - 7.3 km (4.5 mi) Silver BRT certified (2013).
TransMilenio - Calle 80 17 December 2000 1 - 7.5 km (4.7 mi) Gold BRT certified (2013).
TransMilenio - Americas 21 December 2003 1 3 12.7 km (7.9 mi)
TransMilenio - NQS 2005 1 - 8.6 km (5.3 mi)
TransMilenio - El Dorado 2005 1 - 10.8 km (6.7 mi)
Cali MIO Metro Cali S.A. 1 March 2009 9 77 39 km (24 mi) Phase I completed; phase II under construction. Silver BRT certified (2013).
Medellín es:Metroplús Metroplus SA (es) 22 December 2011 3 27 12.5 km (7.8 mi) Line 2 opened 2013 Gold BRT certified (2013).
Barranquilla Transmetro Transmetro S.A. 7 April 2010 2 18 13.2 km (8.2 mi) Silver BRT certified (2013).
Bucaramanga Metrolínea Metrolínea 22 December 2009 11 - 7.5 km (4.7 mi) Silver BRT certified (2016).
Pereira Megabús - 21 August 2006 3 60 19.2 km (11.9 mi) Silver BRT certified (2013).
Cartagena Transcaribe TransCaribe SA 17 November 2015 5 16 10.5 km (6.5 mi) Silver BRT certified (2016).

Ecuador

BRT systems in  Ecuador
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Quito Metrobus-Q (es) (Metropolitan Public Passenger Transport Company EPMTP Some private companies) Metrobus-Q - es:Trolebús de Quito, Central-Norte and Ecovia 17 December 1995 3 124 65.4 km (40.6 mi) The BRT system Trolleybuses in Quito operated by Compañía Trolebús Quito. Plans exist to convert the northernmost portion of the system to light rail. Ecovía and Metrobus diesel BRT lines have several subsystems: Trolebús (Corredor Trole), Ecovía (Corredor Ecovía), Metrobús (Corredor Central Norte), Corredor Sur Oriental and Corredor Sur Occidental. Trolebús electric trolley buses can also operate on gas. Except for local routes, all buses are articulated. eBRT trolleybuses Silver BRT certified (2013).
Metrobus - Corredor sur occidental Empresa Metropolitana de Servicios y Administración del Transporte (EMSAT) 13 July 2001 - - 13.4 km (8.3 mi) eBRT trolleybuses Bronze BRT certified (2014).
Metrobus - Corredor sur oriental - - - 11.1 km (6.9 mi)
Guayaquil Metrovía Fundación de Transporte Masivo Urbano de Guayaquil - Troncal 1: Guasmo-Río Daule 30 July 2006 7 26 30.51 km (18.96 mi) Bronze BRT certified (2013).
Metrovia - Troncal 2: 16 February 2012 - - 13.9 km (8.6 mi)
Metrovia - Troncal 3: Bastion-Centro 4 May 2008 - - 16.5 km (10.3 mi)
Cuenca Troncal (100) (es) Sistema Integrado de Transporte (Línea 100, Línea 200) 2014 2 - - Not BRT certified in 2014.
Loja Loja Intermodal Urban Transport System (SITU) (es) - 18 November 2015 10 - 50 km (31 mi) Not BRT certified in 2015.

French Guiana

In the following table, BRT systems in light blue are under construction.

BRT systems in French Guiana
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Cayenne Cayenne BRT - - - - -

Peru

BRT systems in  Peru
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Lima Metropolitano Perú Masivo S.A., Lima Bus Internacional 1 S.A., Lima Vías Express S.A., Transvial Lima S.A.C. October 2010 1 38 33 km (21 mi) Metropolitano is Peru's first mass transit system implemented in several decades. It runs from the northern district of Independencia to the southern district of Chorrillos, on roads such as Avenida Paseo de la República, Av. Alfonso Ugarte and Av. Tupac Amaru. Bronze BRT certified (2013).
Arequipa Arequipa Integrated Transportation System (es) 11 consortia 30 May 2019 11 - 20 km (12 mi) Pre-operational Phase May 2019 - November 2024 under construction. Not BRT certified in 2022.
Trujillo Trujillo Integrated Transportation System (SITT) (es) Trujillo Metropolitan Transport (TMT) September 2011, 2 - - Not BRT certified in 2012.

Uruguay

BRT systems in  Uruguay
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Montevideo Agraciada/Garzón Corridor (es) Metropolitan Transportation System (es) (STM) 2012 2 17 6 km (3.7 mi) Bronze BRT certified (2014).

Venezuela

In the following table, BRT systems in light blue are under construction.

BRT systems in  Venezuela
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Caracas BusCaracas Metro de Caracas C.A. October 2012 1 11 5.2 km (3.2 mi) Corridor line 7 Silver BRT certified (2014).
Mérida Trolmérida Tromerca (Trolebús Mérida, CA) 18 June 2007 3 22 15.2 km (9.4 mi) eBRT trolleybuses, ended operation August 2016 as trolleybus. Not BRT certified in 2022.
Barquisimeto Transbarca (es) - 14 September 2013 2 41 24 km (15 mi)
Guayana City BTR Battle of Sanfelix (es) TransBolivar December 2015 1 2 20 km (12 mi) Not BRT certified in 2016.
Gran Barcelona TransAnzoátegui (es) - 19 November 2015 4 20 33 km (21 mi)
Maracay TransMaracay (es) TransAragua SA 18 April 2015 1 13 8.1 km (5.0 mi)
Valencia TransCarabobo (es) - 11 July 2014 6 156 -
Barinas Barinas Bus (es) BUSBARINAS 11 March 2013 10 10 33 km (21 mi)
Coro TransFalcon (es) TransFalcón CA 27 March 2014 1 7 - Not BRT certified in 2014.
Maracaibo TransMaracaibo - 31 August 2009 1 - - Phase 1A is operated by Piotrans Pty Ltd, while Phase 1B is operated by Litsamaiso Pty Ltd.
14 October 2013 1 18 18 km (11 mi)

See also

  • Articulated bus
  • Autonomous Rail Rapid Transit
  • Bus
  • Bus lane
  • Bi-articulated bus
  • BRT Standard
  • Bus rapid transit
  • Bus rapid transit creep
  • Capacitor electric vehicle
  • Double-decker bus
  • Electric bus
  • Fuel cell bus
  • Guided bus
  • List of bus operating companies
  • List of guided busways and BRT systems in the United Kingdom
  • List of trolleybus systems
  • Public transport bus service
  • Quality Bus Corridor
  • Queue jump
  • Single-deck bus
  • Trolleybus

wikipedia, wiki, encyclopedia, book, library, article, read, free download, Information about List of bus rapid transit systems, What is List of bus rapid transit systems? What does List of bus rapid transit systems mean?