Pearl River Delta Metropolitan Region intercity railway

The Pearl River Delta Metropolitan Region Intercity Railway System (Chinese: 珠江三角洲地區城際軌道交通, abbreviated as PRDIR) is a regional higher-speed rail and suburban rail network being gradually constructed in the Pearl River Delta (Guangdong–Hong Kong–Macao Greater Bay Area), People's Republic of China. The project's goal is to have every major urban center in the Greater Bay Area to be within one-hour travel by rail to Guangzhou. On March 16, 2005, the State Council approved plans for a regional high-speed commuter rail network for the Jingjinji, Yangtze River Delta and the Pearl River Delta. According to the plan, by 2020, the network will have a total route mileage of about 600 kilometres (370 mi). In September 2009, the plan was expanded to 1,478 km (918 mi) of routes split up into 23 lines. In the long term vision network length will reach 1,890 km (1,170 mi) by 2030. By then the network will provide basic coverage to the Pearl River Delta region. The Suishen ICR, Guanghui ICR and Guangfozhao ICR accept Alipay, avoiding the need to purchase tickets in advance.

Pearl River Delta Metropolitan Region intercity railway
Overview
LocalePearl River Delta
Transit typeHigher-speed rail, Regional rail
Number of lines7
Number of stations99
Operation
Began operation2011
Operator(s)
  • China Railway Guangzhou Group
  • Guangdong Intercity Railway Operation Co., Ltd.
Technical
System length713.8 km (443.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationAC 25 kV overhead lines
Pearl River Delta Metropolitan Area Intercity Railway
Traditional Chinese珠江三角洲地區城際軌道交通
Simplified Chinese珠江三角洲地区城际轨道交通
Transcriptions
Standard Mandarin
Hanyu PinyinZhūjiāng Sānjiǎozhōu Dìqū Chéngjì Guǐdào Jiāotōng
Yue: Cantonese
Jyutpingzyu1gong1saam1gok3zau1dei6keoi1sing4zai3gwai2dou6gaau1tung1

Operational lines

The system currently has seven lines, as of August 2025.

Line Terminals Opened Length
km
Active
Stations
Operator Owner
 Guangzhu  Guangzhou South Zhuhai 2011 177.534 23 CR Guangzhou Group Guangdong Guangzhu Intercity Rail Transit
Jiangmen
 Suishen  Xintang South Shenzhen Airport 2019 97 16 PRDIR
 Zhuji  Zhuhai Zhuhai Airport 2020 39.24 6 Guangdong Guangzhu Intercity Rail Transit
 Guanghui  Panyu Huizhou North 2016 146.64 25 Guangdong Intercity PRDIR
 Guangzhao  Panyu Zhaoqing 2016 117.68 16
 Guangqing  Huadu Feixia 2020 57.781 9
 East Ring  Huadu Panyu 2020 77.953 4

Guangzhu ICR

The Guangzhou–Zhuhai Intercity Railway or Guangzhu Intercity Railway is a 116 km dedicated, grade-separated passenger railway linking New Guangzhou Station in Panyu, Guangzhou, and Zhuhai Airport in Zhuhai, via Shunde, Zhongshan and Jiangmen. Operation began in 2011.

Suishen ICR

The Guangzhou–Shenzhen Intercity Railway, also known as the Suishen Intercity Railway (Chinese: 穗深城际铁路; pinyin: Suì-Shēn Chéngjì Tiělù) is a 97-kilometre (60 mi) regional rapid railway line that runs roughly along the east bank of the Pearl River connecting the major cities of Guangzhou, Dongguan, and Shenzhen. It will use CRH6 EMUs with a top speed of 140 km/h (87 mph). Operation began on 15 December 2019.

Zhuji ICR

The Zhuji Intercity Railway is a high-speed railway connecting Gongbei Subdistrict in Zhuhai with Zhuhai Jinwan Airport via Hengqin. Phase 1 started operation on 18 August 2020. Phase 2 from Zhuhai Changlong to Zhuhai Airport opened in 3 March 2024.

Guanghui ICR

The Guanghui Intercity Railway or Guanghui Urban Railway is a 25 station, 146.6 km long, regional rapid railway line that connects Guangzhou to Huizhou. The line was originally planned to use subway type cars with Siemens technology. However it was plans changed partway through construction to use 8 car CRH6 EMUs capable of running up to 200 km/h (120 mph). The line started construction in 2009 and was expected to open in late 2013. Construction was completed in June 2013 and test runs began in 2014, but the first segment of the line, from Xiaojinkou-Changping East did not open until 30 March 2016. On 23 January 2024, operation of Guanghui ICR has transferred from CR Guangzhou to Guangdong Intercity company.

Guangzhao ICR

The Guangzhao Intercity Railway or Fozhao Urban Railway is a 16 station long regional rapid railway line. It connects Guangzhou to Zhaoqing, via Foshan. Operation began on 30 March 2016. On 23 January 2024, operation of Guangzhao ICR has transferred from CR Guangzhou to Guangdong Intercity company.

Guangqing ICR

Guangzhou East Ring intercity railway

Lines under construction

Under construction
Project Terminals/Stations Length
km (mi)
Stations Construction progress Expected opening time Owner Operator
 GQ  Phase 1 South Extension Huadu – Guangzhou Baiyun 22 km (14 mi) 4 Under construction 2025 PRDIR Guangdong Intercity
 SS  Xintang South – Baiyun Airport North 55.1 km (34.2 mi) 10 Under construction 2025 Shenguanhui Intercity (subsidiary of Shenzhen Metro)
 GH  Remaining station Xiaojinkou – Huizhou North 6.356 km (3.949 mi) 1 Under construction 2025 Guanhui Intercity Northern Extension Line Guangdong Intercity
 SS  Southern extension Shenzhen Airport – Qianhaiwan 15.15 km (9.41 mi) 3 Under construction 2026 Suishen Intercity Shenguanhui Intercity (subsidiary of Shenzhen Metro)
Qianhaiwan – Huanggang Checkpoint 20.547 km (12.767 mi) 2
 GFC  West Ring Foshan West – Huadu 47.01 km (29.21 mi) 9 Under construction 2027 Guangfo West Ring Intercity Guangdong Intercity

Guangfo Circular ICR

Ring service around Guangzhou and Foshan, mostly making use of trackage from other Metropolitan Region Intercity Railway Lines and existing freight railways. A new section under construction, known as the Guangfo Link, is a 35 km long railway line that connects Guangzhou South Railway Station to Foshan West Railway Station. It has a top speed of 200 kilometres per hour (120 mph) and will use 6 car CRH6 EMUs capable of running up to 2.5-minute frequencies. It is expected to start construction in late 2012 and completed in 2016 or 2017. This has now since been delayed to 2027.

Shenzhen–Dayawan ICR

An underground regional railway connecting Shenzhen and Huiyang District in southern Huizhou from Shenzhen Bao'an International Airport to Shenzhen Pingshan railway station. It started construction in 2022 and is expected to complete in late 2026.

Shenhui ICR

An underground regional railway connecting Shenzhen and Huicheng District in northern Huizhou. It started construction in 2022 and is expected to complete in late 2026.

See also

wikipedia, wiki, encyclopedia, book, library, article, read, free download, Information about Pearl River Delta Metropolitan Region intercity railway, What is Pearl River Delta Metropolitan Region intercity railway? What does Pearl River Delta Metropolitan Region intercity railway mean?