Purple Line (Chennai Metro)

The Purple Line or Line 3 is one of the under construction lines of Chennai Metro Phase-II stretching from Madhavaram Milk Colony to Siruseri SIPCOT 2. The 45.4 km (28.2 mi) long line will consist of 48 stations, out of which 28 will be underground and 20 will be at grade or elevated.

Purple Line (Line 3)
Overview
Native nameOodhā vaḻittaṭam
StatusUnder construction
Termini
  • Madhavaram Milk Colony
  • Siruseri SIPCOT 2
Connecting linesOperational (5):
Blue Line Green Line  Chennai MRTS ,  Chennai Suburban West Line ,  Chennai Suburban South Line 
Upcoming (2):
Red Line Yellow Line
Stations48
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Delhi Metro Rail Corporation
Depot(s)Semmancheri
Madhavaram
Rolling stock
  • Alstom
  • BEML
History
Planned openingDecember 2026; 10 months' time (2026-12)
Technical
Line length45.4 km (28.2 mi)
Number of tracks2
Character26.7 km (16.6 mi) Underground
18.7 km (11.6 mi) Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
SignallingCBTC Signalling System
Route map

Legend
Madhavaram Milk Colony Red Line
Madhavaram High Road
Moolakadai
Sembiyum
Perambur Market
Perambur
Perambur railway station
Ayanavaram
Otteri Nullah
Otteri
Pattalam
Perambur Barracks Road
Purasaiwakkam
Kellys
Kilpauk
Kilpauk on Green Line
Chetput Lake
Chetpet railway station
Chetpet
Cooum River
Sterling Road
Nungambakkam
Anna Flyover
Thousand Lights on Blue Line
Thousand Lights
Royapettah
Dr. Radhakrishnan Salai
Thirumayilai Yellow Line
Mandaveli
Greenways Road
Adyar River
Adyar Junction
Adyar Depot
Buckingham Canal
Indira-Nagar
Thiruvanmiyur
Chennai MRTS line
Tharamani
Nehru Nagar
Kandanchavadi
Perungudi
Thoraipakkam
Mettukuppam
PTC Colony
Okkiyampet
Okkiam Maduvu
Karapakkam
Okkiyam Thoraipakkam
Sholinganallur Red Line
Sholinganallur Lake I
Sholinganallur Lake II
Semmancheri metro depot
Semmancheri I
Semmancheri II
Gandhi Nagar
Navallur
Siruseri
SIPCOT 1
SIPCOT 2

Planning and construction

Phase II

The construction of the first phase of Chennai Metro started in June 2009. Commercial operations started on the green line in June 2015. On 10 February 2019, the extension of blue line was opened, completing the first phase of the metro.

In July 2016, Government of Tamil Nadu announced that the second phase would have three lines totaling 104 km (65 mi) in length with 104 stations. Two corridors would extend from Madhavaram connecting with Siruseri and Sholinganallur respectively (lines 3 and 5) with the third corridor connecting Koyambedu with Lighthouse (line 4). The third line connecting Madhavaram Milk Colony and Siruseri SIPCOT will extend to 45.8 km (28.5 mi) of which 19.1 km (11.9 mi) would be elevated and 26.7 km (16.6 mi) underground. It will consist of 50 stations including 30 undergrounds stations. The stations for the second phase were designed to be smaller than the existing stations operational in the first phase.

On 20 November 2020, foundation stone for the second phase was laid and construction commenced. In November 2022, Alstom was awarded the contract to supply metro coaches for the phase II expansion. In May 2023, CMRL announced a revised plan for the second phase, with the line extending for 45.4 km (28.2 mi), and a revised station count of 48 stations.

Chennai Metro - Phase II
Line Name Terminals Length (km) Stations Status
Purple Line Madhavaram Siruseri SIPCOT 2 45.4 48 Under construction

The second phase is estimated to cost 632.46 billion (US$7.5 billion) of which initially 47.10 billion (US$560 million) was loaned by Japan International Cooperation Agency. On 14 February 2021, the Prime Minister of India announced that the government has set aside 630 billion (US$7.5 billion) for the construction of phase II and further extension.

Phase II extension

In 2022, the state government proposed an extension plan for the third line from Siruseri to Kilambakkam, covering an approximate 25 km (16 mi). In September 2023, feasibility report was submitted by CMRL for the proposed expansion of the line, green lighting the same. The extension was scrapped due to patronage and profitability concerns.

Stations

Purple Line
S.No Station Name Expected Opening Connections Station Layout
English Tamil
1 Madhavaram Milk Colony மாதவரம் பால் பண்ணை December 2027 Red Line (Under Construction) Underground
2 Madhavaram High Road மாதவரம் நெடுஞ்சாலை December 2027 Underground
3 Moolakadai மூலக்கடை December 2027 Underground
4 Sembiyum செம்பியம் December 2027 Underground
5 Perambur Market பெரம்பூர் அங்காடி December 2027 Underground
6 Perambur பெரம்பூர் December 2027

Perambur
(West Line)

Underground
7 Ayanavaram அயனாவரம் December 2027 Ayanavaram MTC Bus Depot Underground
8 Otteri ஓட்டேரி December 2027 Underground
9 Pattalam பட்டாளம் December 2027 Underground
10 Perambur Barracks Road பெரம்பூர் பேரக்ஸ் சாலை December 2027 Underground
11 Purasaiwakkam புரசைவாக்கம் December 2027 Underground
12 Kellys கெல்லீஸ் December 2027 Underground
13 Kilpauk கீழ்ப்பாக்கம் December 2027 Green Line Underground
14 Chetpet சேத்துப்பட்டு December 2027

Chetpet
(South Line)

Underground
15 Sterling Road ஸ்டெர்லிங் சாலை December 2027 Underground
16 Nungambakkam நுங்கம்பாக்கம் December 2027 Underground
17 Anna Flyover அண்ணா மேம்பாலம் December 2027 Underground
18 Thousand Lights ஆயிரம் விளக்கு December 2027 Blue Line Underground
19 Royapettah ராயப்பேட்டை December 2027 Underground
20 Dr. Radhakrishnan Salai டாக்டர் ராதாகிருஷ்ணன் சாலை December 2027 Underground
21 Thirumayilai திருமயிலை December 2027 Thirumayilai

(Chennai MRTS)
Yellow Line (Under Construction)

Underground
22 Mandaiveli மந்தைவெளி December 2027 Underground
23 Greenways Road பசுமைவழிச் சாலை December 2027 Underground
24 Adyar Junction அடையாறு சந்திப்பு December 2027 Underground
25 Adyar Depot அடையாறு பணிமனை December 2027 Underground
26 Indira Nagar இந்திரா நகர் December 2027 Indira Nagar

(Chennai MRTS)

Underground
27 Thiruvanmiyur திருவான்மியூர் December 2027 Thiruvanmiyur

(Chennai MRTS)

Underground
28 Taramani தரமணி December 2027 Underground
29 Nehru Nagar நேரு நகர் March 2027 Elevated
30 Kandanchavadi கந்தன்சாவடி March 2027 Elevated
31 Perungudi பெருங்குடி March 2027 Elevated
32 Thoraipakkam துரைப்பாக்கம் March 2027 Elevated
33 Mettukuppam மேட்டுக்குப்பம் March 2027 Elevated
34 PTC Colony பி.டி.சி. காலனி March 2027 Elevated
35 Okkiyampet ஒக்கியம்பேட்டை March 2027 Elevated
36 Karapakkam காரப்பாக்கம் March 2027 Elevated
37 Okkiyam Thoraipakkam ஒக்கியம் துரைப்பாக்கம் March 2027 Elevated
38 Sholinganallur சோழிங்கநல்லூர் March 2027 Red Line (Under Construction) Elevated
39 Sholinganallur Lake I சோழிங்கநல்லூர் ஏரி I March 2027 Elevated
40 Sholinganallur Lake II சோழிங்கநல்லூர் ஏரி II March 2027 Elevated
41 Semmancheri Depot செம்மஞ்சேரி பணிமனை March 2027 Elevated
42 Semmancheri I செம்மஞ்சேரி I March 2027 Elevated
43 Semmancheri II செம்மஞ்சேரி II March 2027 Elevated
44 Gandhi Nagar காந்தி நகர் March 2027 Elevated
45 Navallur நாவலூர் March 2027 Elevated
46 Siruseri சிறுசேரி March 2027 Elevated
47 SIPCOT 1 சிப்காட் 1 March 2027 Elevated
48 SIPCOT 2 சிப்காட் 2 March 2027 Elevated

§ under construction