List of high-speed railway lines

This article provides a list of operational and under construction high-speed rail networks, listed by country or region. While the International Union of Railways defines high-speed rail as public transport by rail at speeds of at least 200 km/h (124 mph) for upgraded tracks and 250 km/h (155 mph) or faster for new tracks, this article lists all the systems and lines that support speeds over 200 km/h (120 mph) regardless of their statuses of upgraded or newly built.

Overview

Operational networks

The following table is an overview of high-speed rail in service and under construction by country. It shows all the high speed lines (speed of 200 km/h (125 mph) or over) in service. The list is based on UIC figures (International Union of Railways), updated with other sources.

Operational length in km:
  1. China: 48,000 (64.6%)
  2. Spain: 3,973 (5.34%)
  3. France: 3,516 (4.73%)
  4. Germany: 3,348 (4.50%)
  5. Japan: 3,066 (4.12%)
  6. Sweden: 1,711 (2.30%)
  7. South Korea: 1,548 (2.08%)
  8. United Kingdom: 1,485 (2.00%)
  9. Italy: 1,312 (1.77%)
  10. Others: 6,375 (8.58%)

By region

Operational length in km:
  1. Asia: 55,206 (74.5%)
  2. Europe: 18,547 (25.0%)
  3. Africa: 186 (0.25%)
  4. North America: 136 (0.18%)

Freight services

Networks under construction

Africa

Algeria

Line Length Type Maximum speed Opening Status
Hassi Messaoud-Touggourt 153 km (95 mi) new 220 km/h (140 mph) No data Under construction
Oued Tlélat–Tlemcen 132 km (82 mi) New 220 km/h (140 mph) TBD Under construction

Egypt

Line Termini Length Type Maximum speed Opening Status
Red line Mersa Matruh–Ain Sokhna 660 km (410 mi) New 230 km/h (140 mph) 2027 Under construction

Morocco

Line Termini Length Type Maximum speed Opening Status
Al Boraq Tanger-Ville–Kenitra 186 km (116 mi) New 320 km/h (200 mph) 2018 Operational
Tanger-Ville–Casablanca 137 km (85 mi) Upgraded 220 km/h (140 mph) TBD Undergoing upgrade
Kenitra–Rabat 55 km (34 mi) New 320 km/h (200 mph) 2027 Under construction
Kenitra-Marrakech 375 km (233 mi) New 320 km/h (200 mph) TBD Under construction
Fez-Rabat 180 km (110 mi) New 320 km/h (200 mph) 2030 Under construction

Asia

China

Line Termini Length Type Maximum speed Opening Status
Shanghai maglev train Longyang Road–Pudong International 30.5 km (19.0 mi) New (Maglev) 431 km/h (268 mph) 2004 Operational
Beijing–Shanghai Beijing south–Tianjin West / Shanghai Hongqiao 1,318 km (819 mi) New 350 km/h (220 mph) 2011 Operational
Beijing–Guangzhou[bc] Beijing west–Guangzhou 2,230 km (1,390 mi) New 350 km/h (220 mph) 2012 Operational
Hangzhou–Fuzhou–Shenzhen Hangzhou east–Shenzhen north 1,495 km (929 mi) New 350 km/h (220 mph) 2013 Operational
Huhanrong PDL Shanghai Hongqiao–Chengdu 2,078 km (1,291 mi) New 350 km/h (220 mph) 2014 Operational
Shanghai–Kunming Shanghai Hongqiao–Kunming south 2,066 km (1,284 mi) New 350 km/h (220 mph) 2016 Operational
Guangzhou–Kunming Guangzhou south–Kunming south 1,285 km (798 mi) New 350 km/h (220 mph) 2016 Operational
Suifenhe–Manzhouli Suifenhe–Manzhouli 714 km (444 mi) Upgraded 250 km/h (160 mph) 2018 Operational
Qingdao–Yinchuan Qingdao north–Yinchuan 1,762 km (1,095 mi) Upgraded 350 km/h (220 mph) 2018 Operational
Beijing–Lanzhou Beijing–Lanzhou 1,526 km (948 mi) Upgraded 350 km/h (220 mph) 2019 Operational
Beijing–Harbin[bc] Beijing Chaoyang–Harbin / Dalian 1,700 km (1,100 mi) New 350 km/h (220 mph) 2021 Operational
Eurasia Continental Bridge Lianyungang–Ürümqi 3,422 km (2,126 mi) New 350 km/h (220 mph) 2021 Operational
Coastal corridor (north extension) Dandong–Ningbo 2,659 km (1,652 mi) New 350 km/h (220 mph) 2027 Mostly operational
Coastal corridor (south extension) Huizhou south–Dongxing 954 km (593 mi) New 350 km/h (220 mph) 2028 Mostly operational
Hohhot–Nanning Hohhot–Nanning 2,779.7 km (1,727.2 mi) New 350 km/h (220 mph) 2028 Mostly operational
Baotou (Yinchuan)–Hainan Baotou–Sanya / Xi'an north 4,664 km (2,898 mi) New 350 km/h (220 mph) 2028 Mostly operational
Lanzhou (Xining)–Guangzhou Lanzhou west–Guangzhou 2,282 km (1,418 mi) New 350 km/h (220 mph) 2028 Mostly operational
Beijing–Hong Kong (Taipei) Beijing Fengtai–Hong Kong West Kawloon / Taipei 4,392 km (2,729 mi) New 350 km/h (220 mph) 2029 Mostly operational
Shanghai–Chongqing–Chengdu Shanghai Baoshan–Chengdu 5,130 km (3,190 mi) New 350 km/h (220 mph) 2029 Partly operational
Beijing–Kunming Beijing–Kunming / Chongqing 3,795.7 km (2,358.5 mi) New 350 km/h (220 mph) 2030 Mostly operational
Xiamen–Chongqing Xiamen–Chongqing 937 km (582 mi) New 350 km/h (220 mph) TBD Partly operational
Regional railways Multiple lines 1,611 km (1,001 mi) New 350 km/h (220 mph) 2008–2020 Operational
Intercity railways Multiple lines 7,210 km (4,480 mi) New 250 km/h (160 mph) 2008–2020 Operational
Class I railways Multiple lines 5,056.9 km (3,142.2 mi) Upgraded 200 km/h (120 mph) 2012–2019 Operational

India

Line Termini Length Type Maximum speed Opening Status
Mumbai–Ahmedabad Mumbai BKC–Sabarmati 508.18 km (315.77 mi) New 320 km/h (200 mph) 2027–2028 Under construction

Indonesia

Line Termini Length Type Maximum speed Opening Status
Whoosh high-speed railway Halim (Jakarta)–Tegalluar (Bandung) 142.8 km (88.7 mi) New 350 km/h (220 mph) 2023 Operational

Japan

Line Termini Length Type Maximum speed Opening Status
Tokaido Shinkansen Tokyo–Shin-Osaka 515.4 km (320.3 mi) New 285 km/h (177 mph) 1964 Operational
San'yō Shinkansen Shin-Osaka–Hakata 553.7 km (344.1 mi) New 300 km/h (190 mph) 1972–1975 Operational
Tōhoku Shinkansen Tokyo–Shin-Aomori 674.9 km (419.4 mi) New 320 km/h (200 mph) 1982–2010 Operational
Jōetsu Shinkansen Tokyo–Niigata 269.5 km (167.5 mi) New 275 km/h (171 mph) 1982 Operational
Hokuriku Shinkansen Takasaki–Tsuruga 470.6 km (292.4 mi) New 260 km/h (160 mph) 1997–2024 Operational
Kyushu Shinkansen Hakata–Kagoshima-Chūō 256.8 km (159.6 mi) New 260 km/h (160 mph) 2004–2011 Operational
Nishi Kyushu Shinkansen Takeo-Onsen–Nagasaki 66 km (41 mi) New 260 km/h (160 mph) 2022 Operational
Hokkaido Shinkansen Shin-Aomori–Shin-Hakodate-Hokuto 148.8 km (92.5 mi) New 260 km/h (160 mph) 2016 Operational
Shin-Hakodate-Hokuto-Sapporo 212 km (132 mi) New 320 km/h (200 mph) 2031+ Under Construction
Chūō Shinkansen Shinagawa (Tokyo)–Nagoya 285.6 km (177.5 mi) New (Maglev) 505 km/h (314 mph) 2035+ Under construction

Saudi Arabia

Line Termini Length Type Maximum speed Opening Status
Haramain HSR Mecca–Medina 453 km (281 mi) New 300 km/h (190 mph) 2018 Operational
Saudi Landbridge Project Jeddah–Riyadh 950 km (590 mi) New 250 km/h (160 mph) 2030 Under construction

South Korea

Line Termini Length Type Maximum speed Opening Status
Gyeongbu HSR Seoul–Busan 417.4 km (259.4 mi) New 305 km/h (190 mph) 2004–2015 Operational
Jeolla Line Iksan–Yeosu Expo 180.4 km (112.1 mi) Upgraded 230 km/h (140 mph) 2011 Operational
Honam HSR Osong–Mokpo 249.2 km (154.8 mi) New 305 km/h (190 mph) 2015 Operational
Suseo–Pyeongtaek HSR Suseo–PyeongtaekJije 61.1 km (38.0 mi) New 305 km/h (190 mph) 2016 Operational
PyeongtaekJije–Osong 46.4 km (28.8 mi) 2028 Under construction
Gyeonggang Line Seowonju–Gangneung 120.2 km (74.7 mi) New 250 km/h (160 mph) 2017 Operational
Yeoju–Seowonju 22.1 km (13.7 mi) 2027 Under construction
Jungbunaeryuk Line Bubal–Mungyeong 92.7 km (57.6 mi) New 230 km/h (140 mph) 2021-2024 Operational
Mungyeong–Gimcheon 70.1 km (43.6 mi) Upgraded 250 km/h (160 mph) 2032 Approved
Jungang Line Cheongnyangni–Moryang 185.4 km (115.2 mi) Partly new 250 km/h (160 mph) 2021–2024 Operational
Donghae Line Taehwagang–Samcheok 242.3 km (150.6 mi) Upgraded 200 km/h (120 mph) 2025 Operational
Gangneung–Jejin 111.7 km (69.4 mi) New 250 km/h (160 mph) 2027 Under construction
Seohae Line Seohwaseong–Hongseong 90 km (56 mi) New 250 km/h (160 mph) 2026 Under construction
Janghang Line Hongseong–Iksan 95.5 km (59.3 mi) Upgraded 250 km/h (160 mph) 2027 Undergoing upgrade
Gyeongjeon Line Bujeon–Suncheon 165.8 km (103.0 mi) Upgraded 230 km/h (140 mph) 2025 Undergoing upgrade
Imseong-ri–Boseong 82.5 km (51.3 mi) 200 km/h (120 mph) 2025 Undergoing upgrade
Suncheon–GwangjuSongjeong 121.5 km (75.5 mi) 250 km/h (160 mph) 2030 Undergoing upgrade
Chuncheon-Sokcho Line Chuncheon–Sokcho 93.7 km (58.2 mi) New 250 km/h (160 mph) 2027 Under construction
Nambunaeryuk Line Gimcheon–Geoje 177.9 km (110.5 mi) New 250 km/h (160 mph) 2030 Under construction
Chungbuk Line Osong–Bongyang 115 km (71 mi) Upgraded 250 km/h (160 mph) 2031 Undergoing upgrade

Taiwan

Line Termini Length Type Maximum speed Opening Status
Taiwan HSR Nangang–Zuoying 351 km (218 mi) New 300 km/h (190 mph) 2007-2016 Operational
Taipei–Yilan 56.4 km (35.0 mi) New 300 km/h (190 mph) 2030 Under construction

Thailand

Line Termini Length Type Maximum speed Opening Status
Northeastern HSR Krung Thep Aphiwat Central–Nakhon Ratchasima–Nong Khai 606.01 km (376.56 mi) New 250 km/h (160 mph) 2028 Under construction
Eastern HSR Don Mueang–U-Tapao 220 km (140 mi) New 250 km/h (160 mph) 2029 Under construction

Turkey

Line Termini Length Type Maximum speed Opening Status
Polatlı–Konya Polatlı–Konya 212 km (132 mi) New 250 km/h (160 mph) 2011 Operational
Ankara–Istanbul Sincan–Köseköy 313 km (194 mi) Partly new 250 km/h (160 mph) 2014 Operational
Other sections 20 km (12 mi) New 250 km/h (160 mph) 2028 Under construction
Konya–Yenice railway Konya–Karaman 102 km (63 mi) Upgraded 200 km/h (120 mph) 2021 Operational
Karaman–Ulukışla 135 km (84 mi) Upgraded 200 km/h (120 mph) 2026 Undergoing upgrade
Ankara–Sivas Kayaş–Sivas 394 km (245 mi) New 250 km/h (160 mph) 2023 Operational
Bandırma–Bursa–Osmaneli line (in Turkish) Bandırma–Bursa–Osmaneli 201 km (125 mi) Partly new 200 km/h (120 mph) 2025–2028 Undergoing upgrade
Istanbul–Kapıkule railway Halkalı–Kapıkule 229 km (142 mi) Partly new 200 km/h (120 mph) 2025–2028 Undergoing upgrade
Mersin–Adana–Gaziantep railway Mersin–Gaziantep 311 km (193 mi) Upgraded 200 km/h (120 mph) 2027 Undergoing upgrade
Polatlı–İzmir Polatlı–Alsancak 505 km (314 mi) New 250 km/h (160 mph) 2027 Under construction
Yerköy–Kayseri railway (in Turkish) Yerköy–Kayseri 142 km (88 mi) New 250 km/h (160 mph) 2028 Under construction
Kırıkkale–Çorum–Samsun Kırıkkale Delice–Samsun 293 km (182 mi) New 250 km/h (160 mph) 2028 Under construction
Sivas-Zara line (in Turkish) Sivas-Zara 74 km (46 mi) New 250 km/h (160 mph) 2028 Under construction

Uzbekistan

Line Termini Length Type Maximum speed Opening Status
Tashkent–Bukhara Tashkent–Bukhara 600 km (370 mi) New 250 km/h (160 mph) 2011 Operational
Bhukhara–Khiva Bukhara-Khiva 465 km (289 mi) New 250 km/h (160 mph) 2030 Under Construction

Vietman

  • North–South express railway

Europe

Austria

Line Termini Length Type Maximum speed Opening Status
Western Railway Vienna–Salzburg 243 km (151 mi) Upgraded 230 km/h (140 mph) 1990–2018 Operational
New Lower Inn Valley Railway Kundl–Baumkirchen 40.2 km (25.0 mi) New 220 km/h (140 mph) 2012 Operational
Brannenburg-Kundl 25 km (16 mi) New 250 km/h (160 mph) TBD Under construction
Koralm Railway Graz–Klagenfurt 127 km (79 mi) New 250 km/h (160 mph) 2025 Under construction
Marchegger Eastern railway (in German) Vienna Stadlau - Slovakian border 38 km (24 mi) Upgraded 200 km/h (120 mph) 2026 Undergoing upgrade
de:Pottendorfer Linie (in German) Vienna Inzersdorf Ort - Wr. Neustadt 47 km (29 mi) Upgraded 200 km/h (120 mph) 2029 Undergoing upgrade
Semmering Base Tunnel Gloggnitz–Mürzzuschlag 27.3 km (17.0 mi) New 230 km/h (140 mph) 2030 Under construction
North railway line Gänserndorf–Břeclav 47 km (29 mi) Upgraded 200 km/h (120 mph) 2030 Undergoing upgrade
Brenner Base Tunnel Innsbruck–Italian border 46 km (29 mi) New 250 km/h (160 mph) 2032 Under construction

Baltic States (Estonia, Latvia and Lithuania)

Line Termini Length Type Maximum speed Opening Status
Rail Baltica Tallinn–Vilnius 870 km (540 mi) New 234 km/h (145 mph) 2028–2030–2032 Under construction

Belgium

Line Termini Length Type Maximum speed Opening Status
HSL 1 LGV Nord–Bruxelles-Sud 88 km (55 mi) New 300 km/h (190 mph) 1997 Operational
HSL 2+line 36N Leuven–Liège-Guillemins 66 km (41 mi) New 300 km/h (190 mph) 2002 Operational
Leuven–Bruxelles-Nord 28.8 km (17.9 mi) Partly new 200 km/h (120 mph) 2003–2006 Operational
HSL 3 Liège-Guillemins–Cologne-Aachen 42 km (26 mi) New 260 km/h (160 mph) 2009 Operational
HSL 4 Antwerpen-Centraal–HSL Zuid 36 km (22 mi) New 300 km/h (190 mph) 2009 Operational
Belgian railway line 50A Brussels–Denderleeuw; Gent–Brugge 57.9 km (36.0 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade
Diabolo project N/A (connecting line) 3 km (1.9 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade

Czech Republic

Line Termini Length Type Maximum speed Opening Status
Line 001 Prague-Poříčany 30 km (19 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade
Přerov – Ostrava 25.594 km (15.903 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade
Line 002 Brno-Vranovice 83.796 km (52.068 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade

Denmark

Line Termini Length Type Maximum speed Opening Status
Øresund Line Copenhagen Central–Swedish border 10 km (6.2 mi) New 200 km/h (120 mph) 2000 Operational
Copenhagen–Ringsted Line Copenhagen central–Ringsted 60 km (37 mi) New 200 km/h (120 mph) 2019 Operational
Copenhagen–Fredericia/Taulov Line Ringsted–Odense 96.4 km (59.9 mi) New 200 km/h (120 mph) 2029 Undergoing upgrade
Fehmarn Belt fixed link Ringsted–Rødby 8.3 km (5.2 mi) New 200 km/h (120 mph) 2028 Under construction
Vestfyn Line Odense–Middelfart 35 km (22 mi) New 250 km/h (160 mph) 2028 Under construction

Finland

Line Termini Length Type Maximum speed Opening Status
Kerava–Lahti railway Kerava–Lahti 75.7 km (47.0 mi) New 220 km/h (140 mph) 2006 Operational
Rantarata Helsinki central–Turku Harbour 63 km (39 mi) Upgraded 200 km/h (120 mph) 1995 Operational
Helsinki–Riihimäki Railway Helsinki central–Riihimäki 71.4 km (44.4 mi) Upgraded 200 km/h (120 mph) 1995 Operational
Riihimäki–Tampere railway Riihimäki–Tampere 116 km (72 mi) Upgraded 200 km/h (120 mph) 1995 Operational
Tampere–Seinäjoki railway Lielax–Seinäjoki 156 km (97 mi) Upgraded 200 km/h (120 mph) 2008 Operational
Oulu Main Line Seinäjoki–Lapua 23 km (14 mi) Upgraded 200 km/h (120 mph) 2017 Operational
Lapua–Kokkola 110 km (68 mi) Upgraded 200 km/h (120 mph) 2011 Operational
Kokkola–Ylivieska 79 km (49 mi) Upgraded 200 km/h (120 mph) 2018 Operational
Ylivieska–Liminka 123 km (76 mi) Upgraded 200 km/h (120 mph) 2015 Operational
Savonia railway Kinni-Otava 45 km (28 mi) Upgraded 200 km/h (120 mph) 2006 Operational
Riihimäki–Saint Petersburg railway Riihimäki–Russian border 120 km (75 mi) Upgraded 200 km/h (120 mph) 2010-2013 Operational
Helsinki–Turku high-speed railway ? ? New? 300 km/h (190 mph) 2031 Approved

France

Line Termini Length Type Maximum speed Opening Status
Orléans–Montauban railway Orléans–Vierzon 70.399 km (43.744 mi) Upgraded 200 km/h (120 mph) 1967 Operational
Paris–Bordeaux railway Paris-Austerlitz–Bordeaux-Saint-Jean 331.08 km (205.72 mi) Upgraded 220 km/h (140 mph) 1973 Operational
LGV Sud-Est Paris Gare de Lyon, Paris–Gare de la Part-Dieu, Lyon 409 km (254 mi) New 300 km/h (190 mph) 1981-1983 Operational
LGV Atlantique Gare Montparnasse, Paris–Le Mans/Tours 284 km (176 mi) New 300 km/h (190 mph) 1989 Operational
Mantes-la-Jolie–Cherbourg railway Mantes–Cherbourg 85.267 km (52.982 mi) Upgraded 200 km/h (120 mph) 1989 Operational
Paris–Brest railway Paris-Montparnasse–Brest 47.8 km (29.7 mi) Upgraded 220 km/h (140 mph) 1989 Operational
Strasbourg–Basel railway Strasbourg–Basel 141.3 km (87.8 mi) Upgraded 220 km/h (140 mph) 1990 Operational
Le Mans–Angers railway Le Mans–Angers-Saint-Laud 73.8 km (45.9 mi) Upgraded 220 km/h (140 mph) Unknown Operational
Tours–Saint-Nazaire railway Tours–Nantes 80.6 km (50.1 mi) Upgraded 220 km/h (140 mph) Unknown Operational
Savenay–Landerneau railway Savenay–Quimper 42 km (26 mi) Upgraded 220 km/h (140 mph) Unknown Operational
LGV Rhône-Alpes Lyon-Saint-Exupéry–Valence 115 km (71 mi) New 300 km/h (190 mph) 1992 Operational
LGV Nord Channel Tunnel–Gare du Nord, Paris 333 km (207 mi) New 300 km/h (190 mph) 1993 Operational
LGV Interconnexion Est Aéroport Charles de Gaulle, Paris–Marne-la-Vallée–Chessy, Paris 90 km (56 mi) New 270 km/h (170 mph) 1994 Operational
LGV Méditerranée Avingnon–Marseille-Saint-Charles 216 km (134 mi) New 320 km/h (200 mph) 2001 Operational
LGV Est Gare de l'Est, Paris–Lorraine, Louvigny 406 km (252 mi) New 320 km/h (200 mph) 2007-2016 Operational
LGV Rhin-Rhône Besançon Franche-Comté, Les Auxons–Belfort – Montbéliard, Paris 140 km (87 mi) New 320 km/h (200 mph) 2011 Operational
Perpignan–Barcelona HSR Montpellier SudPerthus Tunnel 17.1 km (10.6 mi) New 300 km/h (190 mph) 2013 Operational
LGV Sud Europe Atlantique Poitiers–Bordeaux-Saint-Jean 340 km (210 mi) New 320 km/h (200 mph) 2017 Operational
LGV Bretagne-Pays de la Loire Sablé-sur-Sarthe–Rennes 214 km (133 mi) New 320 km/h (200 mph) 2017 Operational
Contournement Nîmes – Montpellier Nîmes-Pont-du-Gard–Montpellier Sud 80 km (50 mi) New 220 km/h (140 mph) 2018 Operational
Lyon–Turin HSR Lyon-Saint-Exupéry–Mont d'Ambin Base Tunnel 150 km (93 mi) New 220 km/h (140 mph) 2032 Under construction
LGV Bordeaux–Toulouse Bordeaux-Saint-Jean–Toulouse 222 km (138 mi) New 320 km/h (200 mph) 2032 Under construction

Germany

Line Termini Length Type Maximum speed Opening Status
Berlin–Hamburg Railway Berlin–Hamburg 284.1 km (176.5 mi) Upgraded 230 km/h (140 mph) 1931 Operational
Wanne-Eickel–Hamburg railway Hamburg–Wanne-Eickel 355 km (221 mi) Upgraded 200 km/h (120 mph) 1978 Operational
Augsburg–Nördlingen railway Augsburg-Donauwörth 36.5 km (22.7 mi) Upgraded 200 km/h (120 mph) 1978-1981 Operational
Cologne–Duisburg railway Cologne–Duisburg 64 km (40 mi) Upgraded 200 km/h (120 mph) 1980s Operational
Hamm–Minden railway Hamm–Minden 112 km (70 mi) Upgraded 200 km/h (120 mph) 1980 Operational
Würzburg–Aschaffenburg railway Würzburg–Aschaffenburg 89.3 km (55.5 mi) Upgraded 200 km/h (120 mph) 1982 Operational
Hanover–Minden railway Hannover–Minden 64.4 km (40.0 mi) Upgraded 200 km/h (120 mph) 1984 Operational
Dortmund–Hamm railway Dortmund–Hamm 31 km (19 mi) Upgraded 200 km/h (120 mph) 1986 Operational
Hanover–Hamburg railway Hannover–Hamburg 355.3 km (220.8 mi) Upgraded 200 km/h (120 mph) 1987 Operational
Waghäusel Saalbach–Graben-Neudorf railway NA (Connecting link) 7.94 km (4.93 mi) Upgraded 200 km/h (120 mph) 1988 Operational
Hanover–Würzburg Hanover–Würzburg 327 km (203 mi) New 250 km/h (160 mph) 1991 Operational
Mannheim–Stuttgart Mannheim–Stuttgart 99 km (62 mi) New 250 km/h (160 mph) 1991 Operational
Rhine Railway Mannheim–Rastatt 99 km (62 mi) Upgraded 200 km/h (120 mph) 1991 Operational
Ulm–Augsburg railway (old line) Augsburg-Oberhausen–Dinkelscherben 25.8 km (16.0 mi) Upgraded 200 km/h (120 mph) 1992 Operational
Frankfurt–Göttingen railway Hanau–Hailer-Meerholz 19 km (12 mi) Upgraded 200 km/h (120 mph) 1993 Operational
Hanover–Berlin Hannover–Berlin 258 km (160 mi) New 280 km/h (170 mph) 1998 Operational
Nuremberg–Würzburg railway Nuremberg–Würzburg 102.2 km (63.5 mi) Upgraded 200 km/h (120 mph) 1999 Operational
Mannheim–Frankfurt railway Mannheim–Frankfurt 74.8 km (46.5 mi) Upgraded 200 km/h (120 mph) 1999 Operational
Cologne–Frankfurt Cologne–Frankfurt 180 km (110 mi) New 300 km/h (190 mph) 2002 Operational
Cologne–Aachen Cologne–Düren 39.2 km (24.4 mi) Upgraded 250 km/h (160 mph) 2002 Operational
Düren-Eschweiler Hbf 17.7 km (11.0 mi) Upgraded 200 km/h (120 mph) 2030 Undergoing upgrade
Berlin–Halle railway Berlin–Halle 161.6 km (100.4 mi) Upgraded 200 km/h (120 mph) 2006 Operational
Trebnitz–Leipzig railway Bk–Leipzig 81.2 km (50.5 mi) Upgraded 200 km/h (120 mph) 2006 Operational
Nuremberg–Ingolstadt Nuremberg–Ingolstadt 77.5 km (48.2 mi) New 300 km/h (190 mph) 2006–2013 Operational
Hamm–Warburg railway Hamm–Warburg 131 km (81 mi) Upgraded 200 km/h (120 mph) 2007 Operational
Munich–Augsburg railway Munich–Augsburg 61.9 km (38.5 mi) Upgraded 230 km/h (140 mph) 2011 Operational
Leipzig–Dresden railway Leipzig–Riesa 60 km (37 mi) Upgraded 200 km/h (120 mph) 2014 Operational
Dresden–Riesa 54 km (34 mi) Upgraded 200 km/h (120 mph) 2030 Undergoing upgrade
Erfurt–Leipzig/Halle Erfurt–Leipzig/Halle 123 km (76 mi) New 300 km/h (190 mph) 2015 Operational
Nuremberg–Erfurt Ebensfeld–Erfurt 107 km (66 mi) New 300 km/h (190 mph) 2017 Operational
Ebensfeld–Eltersdorf 83 km (52 mi) Upgraded 230 km/h (140 mph) 2030 Undergoing upgrade
Wendlingen–Ulm Wendlingen–Ulm 59.5 km (37.0 mi) New 250 km/h (160 mph) 2022 Operational
Stuttgart–Wendlingen Stuttgart–Wendlingen 25 km (16 mi) New 250 km/h (160 mph) 2026 Under construction
Mannheim–Saarbrücken railway St. Ingbert–Ludwigshafen 82 km (51 mi) Upgraded 200 km/h (120 mph) 2028 Undergoing upgrade
Lübeck–Puttgarden railway Lübeck–Puttgarden 88.6 km (55.1 mi) Partly new 200 km/h (120 mph) 2030 Undergoing upgrade
Berlin–Dresden railway Berlin Südkreuz–Dresden HBF 174.2 km (108.2 mi) Upgraded 230 km/h (140 mph) 2030 Undergoing upgrade
Karlsruhe–Basel Karlsruhe–Basel 182 km (113 mi) New 250 km/h (160 mph) 2031 Under construction

Greece

Line Termini Length Type Maximum speed Opening Status
P.A.Th.E./P. Bulgarian border–Thessaloniki–Larissa–Athens–Corinth–Patras 160 km (99 mi) Partly new 200 km/h (120 mph) 2022 Mostly operational

Italy

Line Termini Length Type Maximum speed Opening Status
Florence–Rome Firenze Santa Maria Novella, Florence–Roma Termini 254 km (158 mi) New 250 km/h (160 mph) 1992 Operational
Turin–Milan Torino Porta Susa, Turin–Milano Centrale 148.3 km (92.1 mi) New 300 km/h (190 mph) 2006 Operational
Milan–Venice railway Padua–Venice 25 km (16 mi) Upgraded 220 km/h (140 mph) 2007 Operational
Treviglio - Brescia 39.6 km (24.6 mi) New 250 km/h (160 mph) 2016 Operational
Brescia - Verona 45.4 km (28.2 mi) New 250 km/h (160 mph) 2026 Under construction
Verona-Padua 80 km (50 mi) New 250 km/h (160 mph) 2029-2032 Under construction
Milan–Bologna Milano Centrale–Bologna Centrale 214.6 km (133.3 mi) New 300 km/h (190 mph) 2008 Operational
Naples–Salerno Napoli Afragola–Salerno 29 km (18 mi) New 250 km/h (160 mph) 2008 Operational
Verona–Bologna railway Verona–Bologna Centrale 115 km (71 mi) Upgraded 200 km/h (120 mph) 2009 Operational
Rome–Naples Roma Termini–Napoli Centrale 204.6 km (127.1 mi) New 300 km/h (190 mph) 2009 Operational
Bologna–Ancona railway Bologna–Ancona 153 km (95 mi) Upgraded 200 km/h (120 mph) 2015 Operational
Adriatic railway Brindisi–Lecce 38.364 km (23.838 mi) Upgraded 200 km/h (120 mph) 2018 Operational
Pescara–Termoli 89.468 km (55.593 mi) Upgraded 200 km/h (120 mph) 2026 Undergoing upgrade
Pisa–Rome railway Cecina–Castagneto Carducci-Donoratico; Orbetello–Follonica 91 km (57 mi) Upgraded 200 km/h (120 mph) ? Operational
Milan–Verona Milano Lambrate–Verona Porta Nuova 165 km (103 mi) New 300 km/h (190 mph) 2023 Partly operational
Tortona–Genoa Genoa–Tortona 53 km (33 mi) New 250 km/h (160 mph) 2026 Under construction
Naples–Bari Naples–Bari 147 km (91 mi) New 250 km/h (160 mph) 2027 Under construction
Salerno–Reggio di Calabria railway Battipaglia–Romagnano 35 km (22 mi) Partly new 300 km/h (190 mph) 2030 Under construction
Alessandria–Piacenza railway Tortona–Voghera 16 km (9.9 mi) Upgraded 200 km/h (120 mph) 2026 Undergoing upgrade
Palermo–Catania–Messina high-speed railway Palermo–Catania–Messina 67 km (42 mi) New 250 km/h (160 mph) 2029 Under construction
Genoa–Ventimiglia railway Andora–Finale Ligure 32 km (20 mi) Upgraded 200 km/h (120 mph) 2030 Undergoing upgrade
Brenner Base Tunnel+Verona-Brenner railway Austrian borderTunnel's south portal–Verona 198 km (123 mi) Partly new 250 km/h (160 mph) 2032 Under construction
Turin–Lyon high-speed railway Turin–French border 57 km (35 mi) New 220 km/h (140 mph) 2032 Under construction
Venice–Trieste railway Venice–Trieste 153 km (95 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade
Ionian Railway Taranto-Metaponto 43.2 km (26.8 mi) Upgraded 200 km/h (120 mph) TBD Undergoing upgrade

Netherlands

Line Termini Length Type Maximum speed Opening Status
HSL-Zuid Amsterdam central–Belgian border 125 km (78 mi) New 300 km/h (190 mph) 2009 Operational
Lelystad–Zwolle railway Lelystad Centrum–Zwolle 50 km (31 mi) Upgraded 160 km/h (99 mph) 2012 Operational

Norway

Line Termini Length Type Maximum speed Opening Status
Gardermoen Line Oslo–Eidsvoll 64 km (40 mi) New 210 km/h (130 mph) 1998 Operational
Dovre Line Langset-Kleverud 17 km (11 mi) (of 484 km (301 mi)) New 200 km/h (120 mph) 2015 Operational
Eidsvoll-Hamar(-Trondheim) 41 km (25 mi) (of 484 km (301 mi)) Upgraded 200 km/h (120 mph) 2027 Undergoing upgrade
Hamar-Brumunddal-Lillehammer 55 km (34 mi) Partly new 250 km/h (160 mph) 2030-2035 Undergoing upgrade and construction
Vestfold Line Farriseidet–Porsgrunn 23.5 km (14.6 mi) Upgraded 200 km/h (120 mph) 2018 Operational
Drammen–Kobbervikdalen 9 km (5.6 mi) Partly new 200 km/h (120 mph) 2025 Under construction
Kobbervikdalen–Holm 24.7 km (15.3 mi) Partly new 200 km/h (120 mph) 2001–2002 Operational
Nykirke – Holm 14.1 km (8.8 mi) New 200 km/h (120 mph) 2016 Operational
Nykirke – Barkåker 13.6 km (8.5 mi) New 250 km/h (160 mph) 2026 Under construction
Tønsberg – Barkåker 7.7 km (4.8 mi) New 200 km/h (120 mph) 2011 Operational
Tønsberg–Larvik 40 km (25 mi) New 200 km/h (120 mph) 2032 Under construction
Follo Line Oslo–Ski 22 km (14 mi) New 200 km/h (120 mph) 2022 Operational
Østfold Line Ski–Fredrikstad 50 km (31 mi) Partly new 250 km/h (160 mph) 2029 Undergoing upgrade and construction

Poland

Line Termini Length Type Maximum speed Opening Status
Warsaw–Gdańsk railway Warszawa Wschodnia–Gdańsk Główny 150 km (93 mi) Upgraded 200 km/h (120 mph) 2014–2020 Operational
Grodzisk Mazowiecki–Zawiercie railway Grodzisk Mazowiecki–Zawiercie 135.047 km (83.914 mi) Upgraded 200 km/h (120 mph) 1977–2011 Operational
Warsaw-Białystok railway Warszawa Wschodnia–Białystok 224.1 km (139.2 mi) Upgraded 250 km/h (160 mph) 2030 Undergoing upgrade
Y-line Warsaw–Lodz–Wroclaw/Poznan 140 km (87 mi) New 350 km/h (220 mph) 2032 Approved

Portugal

Line Termini Length Type Maximum speed Opening Status
Linha do Norte Santa Apolónia, Lisbon–Campanhã, Porto 332 km (206 mi) Upgraded 220 km/h (140 mph) 1999 Operational
Santa Apolónia, Lisbon–Braga 389 km (242 mi) Upgraded 220 km/h (140 mph) - Operational
Linha do Norte e Linha do Sul Campanhã, Porto–Faro 627 km (390 mi) Upgraded 220 km/h (140 mph) - Operational
Linha do Sul Campolide, Lisbon–Tunes, Silves 273.6 km (170.0 mi) Upgraded 220 km/h (140 mph) 2004 Operational
Linha de Évora Casa Branca–Évora 26.164 km (16.258 mi) Upgraded 200 km/h (120 mph) 2010 Operational
Lisbon–Porto high-speed rail line Lisbon-Santa Apolónia– Porto-Campanhã 290 km (180 mi) New 300 km/h (190 mph) 2030 Under construction
Porto–Vigo high-speed rail line Porto – Vigo on Galicia, Spain borders 155.6 km (96.7 mi) New 250 km/h (160 mph) 2030 Under construction

Russia

Line Termini Length Type Maximum speed Opening Status
Saint Petersburg–Moscow railway Moscow Leningradsky–Moskovsky (Saint Petersburg) 650 km (400 mi) Upgraded 250 km/h (160 mph) 1984 Operational
Moscow–Saint Petersburg HSR Moscow–Saint Petersburg 679 km (422 mi) New 360 km/h (220 mph) 2029 Under construction
Riihimäki–Saint Petersburg railway Finnish border–St. Petersburg 197 km (122 mi) Upgraded 200 km/h (120 mph) 2013 Service discontinued

Serbia

Line Termini Length Type Maximum speed Opening Status
Budapest–Belgrade railway Hungarian border–Belgrade 150 km (93 mi) Upgraded 200 km/h (120 mph) 2025 Operational
Belgrade - Niš Belgrade–Niš 228 km (142 mi) Upgraded 200 km/h (120 mph) 2026 Undergoing upgrade

Spain

Line Termini Length Type Maximum speed Opening Status
Madrid–Seville Madrid Atocha–Seville–Santa Justa 471.8 km (293.2 mi) New 300 km/h (190 mph) 1992 Operational
Madrid–Levante Madrid Atocha–Valencia-Joaquín Sorolla/Alicante 603 km (375 mi) New 300 km/h (190 mph) 1997–2010–2022 Operational
Madrid–Barcelona Madrid Atocha–Barcelona Sants 620.9 km (385.8 mi) New 300 km/h (190 mph) 2003–2008 Operational
Zaragoza-Huesca branch of Madrid–Barcelona high-speed rail line Zaragoza–Huesca 57 km (35 mi) New 200 km/h (120 mph) 2005 Operational
Madrid–Toledo Madrid Atocha–Toledo 74 km (46 mi) New 300 km/h (190 mph) 2005 Operational
Madrid–Málaga Cordoba–Málaga María Zambrano 154.5 km (96.0 mi) New 300 km/h (190 mph) 2007 Operational
Madrid–Galicia Madrid Chamartín–Santiago de Compostela 415.7 km (258.3 mi) New 300 km/h (190 mph) 2011–2021 Operational
Perpignan–Barcelona Perpignan–Barcelona Sants 175.5 km (109.1 mi) New 300 km/h (190 mph) 2013 Operational
Alcázar de San Juan–Cádiz railway Seville–Santa Justa–Cádiz 158.1 km (98.2 mi) Upgraded 220 km/h (140 mph) 2015 Operational
Atlantic Axis A Coruña–Vigo-Urzáiz 155.6 km (96.7 mi) New 200 km/h (120 mph) 2015 Operational
Madrid–Asturias Madrid Chamartín–Lena, Asturias 342.3 km (212.7 mi) New 300 km/h (190 mph) 2015–2023 Operational
Valencia−Sant Vicenç de Calders railway Estació del Nord, Valencia–Sant Vicenç de Calders, El Vendrell 238 km (148 mi) Upgraded 220 km/h (140 mph) 2018 Operational
Andalusian Corridor Antequera-Santa Ana–Granada 125.7 km (78.1 mi) New 300 km/h (190 mph) 2019 Operational
Antequera-Santa Ana-Cadiz 146 km (91 mi) partly new 300 km/h (190 mph) 2030 Under construction
Granada–Almería 75 km (47 mi) New 300 km/h (190 mph) 2030 Under construction
Alcázar de San Juan–Jaén Grañena–Jaén 16.7 km (10.4 mi) Partly new 200 km/h (120 mph) 2020 Operational
Alcázar de San Juan–Mora 67.5 km (41.9 mi) Partly new 300 km/h (190 mph) TBD Under construction
Madrid–Extremadura high-speed rail line Badajoz–Plasencia 192.6 km (119.7 mi) Partly new 200 km/h (120 mph) 2022 Operational
Plasencia–Talayuela (Oropesa) 68.6 km (42.6 mi) Partly new 250 km/h (160 mph) 2025 Under construction
Oropesa–Toledo 127 km (79 mi) Partly new 200 km/h (120 mph) 2030 Under construction
LAV Venta de Baños-Burgos-Vitoria (in Spanish) Venta de Baños-Burgos 86 km (53 mi) New 300 km/h (190 mph) 2022 Operational
Burgos - Miranda de Ebro - Vitoria 51.8 km (32.2 mi) New 300 km/h (190 mph) 2028 Under construction
LAV Palencia–Santander (in Spanish) Palencia–Alar del Rey 78.4 km (48.7 mi) New 350 km/h (220 mph) TBD Under construction
Alar del Rey–Reinosa 44.4 km (27.6 mi) New 350 km/h (220 mph) TBD Under construction
LAV León-Asturias (in Spanish) León-Asturias 70.7 km (43.9 mi) New 250 km/h (160 mph) 2023-2024 Mostly operational
Murcia–Almería Murcia del Carmen–Almería 184 km (114 mi) New 300 km/h (190 mph) 2026 Under construction
Mediterranean corridor Castejon–Pamplona 150 km (93 mi) New 300 km/h (190 mph) 2027 Under construction
Zaragoza–Castejon New 300 km/h (190 mph) 2033 Under construction
Basque Y Bilbao–Vitoria-Gasteiz/San Sebastián 172 km (107 mi) New 220 km/h (140 mph) 2027 Under construction

Sweden

Line Termini Length Type Maximum speed Opening Status
Southern Main Line Malmö–Katrineholm 336 km (209 mi) Upgraded 200 km/h (120 mph) 1990 Operational
Western Main Line Stockholm–Gothenburg 312 km (194 mi) Upgraded 200 km/h (120 mph) 1995 Operational
West Coast Line Lund–Gothenburg 232 km (144 mi) Upgraded, partly new 200 km/h (120 mph) 1985–2023 Operational
East Coast Line Stockholm–Gävle 142 km (88 mi) Upgraded, partly new 200 km/h (120 mph) 1997–2017 Operational
Söderhamn–Enånger 105 km (65 mi) Partly new 200 km/h (120 mph) 1999 Operational
Enånger–Sundsvall and Gävle north bypass 210 km (130 mi) Partly new 200 km/h (120 mph) 2030–2040 Under construction
Ådalen Line Kramfors–Härnösand 30 km (19 mi) Partly new 200 km/h (120 mph) 2012 Operational
Svealand Line Södertälje South–Folkesta 86 km (53 mi) New 200 km/h (120 mph) 1997 Operational
Mälaren Line Solhem-Västerås; Harksta–Kolbäck; Arboga–Hovsta 155 km (96 mi) Upgraded, partly new 200 km/h (120 mph) 2005 Operational
Bothnia Line Höga Kusten Airport–Umeå 190 km (120 mi) New 250 km/h (160 mph) 2010 Operational
Norway/Vänern Line Gothenburg–Öxnered 80 km (50 mi) Upgraded, partly new 200 km/h (120 mph) 2012 Operational
Haparanda Line Kalix–Haparanda 43 km (27 mi) Partly new 250 km/h (160 mph) 2012 Operational
North Bothnia Line Umeå–Luleå 270 km (170 mi) New 250 km/h (160 mph) 2026–2036 Under construction
The East Link Järna–Linköping 160 km (99 mi) New 250 km/h (160 mph) 2035 Under construction
Gothenburg–Borås Double Tracks Gothenburg–Borås 60 km (37 mi) New 250 km/h (160 mph) 2039–2041
Hässleholm–Lund Quad Tracks Hässleholm–Lund 60 km (37 mi) New 250 km/h (160 mph) ≈2040

Switzerland

Line Termini Length Type Maximum speed Opening Status
Solothurn–Wanzwil railway NA (Connecting line) 12 km (7.5 mi) New 200 km/h (120 mph) 2004 Operational
Mattstetten–Rothrist new line Olten–Bern 45 km (28 mi) New 200 km/h (120 mph) 2007 Operational
Lötschberg Base Tunnel NA (Connecting line) 34 km (21 mi) New 250 km/h (160 mph) 2007 Operational
Gotthard Base Tunnel NA (Connecting line) 57 km (35 mi) New 200 km/h (120 mph) 2016 Operational
Ceneri Base Tunnel NA (Connecting line) 15.4 km (9.6 mi) New 200 km/h (120 mph) 2020 Operational
Simplon Railway Vallorbe–Domodossola 232.5 km (144.5 mi) Upgraded 200 km/h (120 mph) 2030 Undergoing upgrade

Turkey

Line Termini Length Type Maximum speed Opening Status
Polatlı–Konya Polatlı–Konya 212 km (132 mi) New 250 km/h (160 mph) 2011 Operational
Ankara–Istanbul Sincan–Köseköy 313 km (194 mi) Partly new 250 km/h (160 mph) 2014 Operational
Other sections 20 km (12 mi) New 250 km/h (160 mph) 2028 Under construction
Konya–Yenice railway Konya–Karaman 102 km (63 mi) Upgraded 200 km/h (120 mph) 2021 Operational
Karaman–Ulukışla 135 km (84 mi) Upgraded 200 km/h (120 mph) 2026 Undergoing upgrade
Ankara–Sivas Kayaş–Sivas 394 km (245 mi) New 250 km/h (160 mph) 2023 Operational
Bandırma–Bursa–Osmaneli line (in Turkish) Bandırma–Bursa–Osmaneli 201 km (125 mi) Partly new 200 km/h (120 mph) 2025–2028 Undergoing upgrade
Istanbul–Kapıkule railway Halkalı–Kapıkule 229 km (142 mi) Partly new 200 km/h (120 mph) 2025–2028 Undergoing upgrade
Mersin–Adana–Gaziantep railway Mersin–Gaziantep 311 km (193 mi) Upgraded 200 km/h (120 mph) 2027 Undergoing upgrade
Polatlı–İzmir Polatlı–Alsancak 505 km (314 mi) New 250 km/h (160 mph) 2027 Under construction
Yerköy–Kayseri railway (in Turkish) Yerköy–Kayseri 142 km (88 mi) New 250 km/h (160 mph) 2028 Under construction
Kırıkkale–Çorum–Samsun Kırıkkale Delice–Samsun 293 km (182 mi) New 250 km/h (160 mph) 2028 Under construction
Sivas-Zara line (in Turkish) Sivas-Zara 74 km (46 mi) New 250 km/h (160 mph) 2028 Under construction

United Kingdom

Line Termini Length Type Maximum speed Opening Status
Great Western Main Line London Paddington–Bristol Temple Meads 190.2 km (118.2 mi) Upgraded 201 km/h (125 mph) 1976 Operational
South Wales Main Line London Paddington–Pilning 34.5 km (21.4 mi) Upgraded 201 km/h (125 mph) 1976 Operational
East Coast Main Line London King's Cross–Edinburgh 552.7 km (343.4 mi) Upgraded 201 km/h (125 mph) 1978 Operational
Cross Country Route York–Bristol Temple Meads 56 km (35 mi) Upgraded 201 km/h (125 mph) 1982 Operational
West Coast Main Line Glasgow central–Euston, London 442 km (275 mi) Upgraded 201 km/h (125 mph) 2005 Operational
High Speed 1 Fawkham Junction–Channel Tunnel 74 km (46 mi) New 300 km/h (190 mph) 2003 Operational
St Pancras, London–Ebbsfleet 39.4 km (24.5 mi) New 230 km/h (140 mph) 2007 Operational
Midland Main Line St Pancras, London / Derby / Nottingham / Chesterfield 100 km (62 mi) Upgraded 201 km/h (125 mph) 2009 Operational
High Speed 2 Euston, London–Birmingham Curzon Street 230 km (140 mi) New 360 km/h (220 mph) Uncertain (originally 2033) Under construction
Crewe-Manchester 153 km (95 mi) New 300 km/h (190 mph) 2040+ Suspended, revived as a private initiative

North America

Canada

  • Alto (high-speed rail)

United States

Line Termini Length Type Maximum speed Opening Status
Northeast Corridor Boston South Station–Washington Union Station 80.3 km (49.9 mi) Upgraded 240 km/h (150 mph) 2000 Operational
Brightline Orlando IAIT–Cocoa 56.3 km (35.0 mi) New 201 km/h (125 mph) 2023 Operational
California HSR San Francisco–Los Angeles 275.198 km (171.000 mi) New 354 km/h (220 mph) 2031–2033 Under construction
Brightline West Las Vegas–Los Angeles 351 km (218 mi) New 322 km/h (200 mph) September 2029 Under construction

See also

wikipedia, wiki, encyclopedia, book, library, article, read, free download, Information about List of high-speed railway lines, What is List of high-speed railway lines? What does List of high-speed railway lines mean?